Miscellaneous
ICA134-3EN2.pdf
2012-04-13
Unlocking the articulation
1
3
4
2
Fig. Articulation in the open position
1. Locking arm
2. Locking pin
3. Locking stud
4. Locking lug
Remember to unlock the articulation before
operating.
Remember to unlock the articulation before
operating.
Fold the locking arm (3) back and secure it in the
locking lug (4) with the stud (3). Insert the locking pin
(2) fitted with a wire, to secure the stud (3). The
locking lug (4) is located on the tractor frame.
Towing
The roller can be moved up to 300 meters (1,000 ft)
using the instructions below.
2
2
1
1
Fig. Propulsion pump
1. Adjusting bolts (2)
2. Lock nuts (2)
Alternative 1
Short distance towing with the engine running
Depress the emergency/parking brake knob and
temporarily shut off the engine. Chock the drum
and tires to prevent the roller from moving
Depress the emergency/parking brake knob and
temporarily shut off the engine. Chock the drum
and tires to prevent the roller from moving
Unscrew both lock nuts (2) and carefully screw in the
adjusting bolts (1) until they stop. Now turn the
adjusting bolts (1) an additional half turn to open the
valves. The valves are located on the propulsion pump.
Start the engine and allow it to idle.
The roller can now be towed and can also be steered
if the steering system is otherwise functioning.
54
Содержание CA134
Страница 2: ......
Страница 12: ...Introduction ICA134 3EN2 pdf 2012 04 13 4 ...
Страница 16: ...Safety when operating ICA134 3EN2 pdf 2012 04 13 8 ...
Страница 18: ...Safety Optional ICA134 3EN2 pdf 2012 04 13 10 ...
Страница 22: ...Special instructions ICA134 3EN2 pdf 2012 04 13 14 ...
Страница 24: ...Technical specifications Noise Vibrations Electrical ICA134 3EN2 pdf 2012 04 13 16 ...
Страница 28: ...Technical specifications Weights and volumes ICA134 3EN2 pdf 2012 04 13 20 ...
Страница 30: ...Technical specifications Working capacity ICA134 3EN2 pdf 2012 04 13 22 ...
Страница 34: ...Technical specifications General ICA134 3EN2 pdf 2012 04 13 26 ...
Страница 40: ...Machine description Decals ICA134 3EN2 pdf 2012 04 13 32 ...
Страница 54: ...Operation Vibration ICA134 3EN2 pdf 2012 04 13 46 ...
Страница 58: ...Operating Stopping ICA134 3EN2 pdf 2012 04 13 50 ...
Страница 66: ...Operating instructions Summary ICA134 3EN2 pdf 2012 04 13 58 ...
Страница 68: ...Operating instructions Summary ICA134 3EN2 pdf 2012 04 13 60 ...
Страница 70: ...Preventive maintenance ICA134 3EN2 pdf 2012 04 13 62 ...
Страница 74: ...Maintenance Lubricants and symbols ICA134 3EN2 pdf 2012 04 13 66 ...
Страница 92: ...Maintenance 250h ICA134 3EN2 pdf 2012 04 13 84 ...
Страница 96: ...Maintenance 500h ICA134 3EN2 pdf 2012 04 13 88 ...
Страница 102: ...Maintenance 1000h ICA134 3EN2 pdf 2012 04 13 94 ...
Страница 105: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...
Страница 106: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...