Installation, Operation and Service Manual
LKP Series 4 Channel OEM
© 2019 DynAmp, LLC
Page 29
041593O
7. TECHNICAL BULLETINS
The following is a list of available technical bulletins that contain relevant information in regards
to high current measurements and the use of LKP systems. The technical bulletins are
available upon request from DynAmp, LLC. Always consult the factory for a list of the latest
technical bulletins.
Table 7.1
Technical Bulletin List
Number
Subject
Title / Description
9908
External Fields Resolving External Magnetic Field Errors (replaces TEC727)
9907
LKP / LKB
LKP and LKB Sensor Mounting Guidelines and Restrictions
9905
LKP / LKB
Recommended Calibration Intervals for LKP or LKB High
Current Systems
9904
Diagnostics
Self Diagnostics for DynAmp High Current Measurement
systems (Accuracy Diagnostics)
987
LKP / LKB
Ferromagnetic Materials near LKP or LKB High Current
Measurement Systems
749
Bus Analysis
Computer Analysis of Measuring Head Locations In High
Current Measurement systems
748
LKP / LKB
Guidelines for locations of LKP or LKB High Current Systems
Measuring Heads on Busses
747
kWH
Volt-hours times Ampere-Hours is NOT equal to Watt-hours
941
Bus Analysis
Data required for Bus Analysis of High Current Measurement
Systems