Dynalite DBC410 Скачать руководство пользователя страница 3

internal view 

DBC410 Installation Manual Rev K.docx

   3

 

 
 
 
 

Alternative Mounting
Point to Enable Easy
Cable Access

1-10V & DSI
Control Outputs

Circuit Breakers &
Emergency Lighting
Line Outputs

40A Supply
 Connections

Knock Out For 
Low Voltage Cable

Entry Glands
for Load Cables

225mm

3

2

0

m

m

DyNet Network
Connections

Control CPU

Relays

Mounting Point

Network Socket

Service Switch

E

A

R

T

H

 L

IN

K

Depth 75mm

Transformer

S

H

E

IL

D

G

N

D

D

+

D

 -

+

1

2

V

A

U

X

0V

CH 1
CH 2
CH 3
CH 4

N

1

N

2

N

3

N

4

LINE 4

LINE 3

LINE 2

LINE 1

 

 
 
 
 

For spare parts, please call your nearest Dynalite Customer Service Centre, and specify 

DBC410

 

Содержание DBC410

Страница 1: ...er Installation Manual contents Warning 2 Hardware Controls 7 Features 2 Troubleshooting 8 Important Safeguards 2 Specification 8 Internal View 3 Mounting 4 Supply Load Cable Connections 5 Connecting Serial Control Cables 6 Supplied by ...

Страница 2: ...eck Connections Treat this device as a switchboard that has been shipped Tighten all load carrying screw connections as vibrations from transport can cause MCB and terminal block screws to become loose Power Sources This device should only be operated from the type of supply specified on the front panel This device must be earthed Output Circuits The load on a circuit should not exceed the specifi...

Страница 3: ...pply Connections Knock Out For Low Voltage Cable Entry Glands for Load Cables 225mm 320mm DyNet Network Connections Control CPU Relays Mounting Point Network Socket Service Switch EARTH LINK Depth 75mm Transformer SHEILD GND D D 12V AUX 0V CH 1 CH 2 CH 3 CH 4 N1 N2 N3 N4 LINE 4 LINE 3 LINE 2 LINE 1 For spare parts please call your nearest Dynalite Customer Service Centre and specify DBC410 ...

Страница 4: ...kets are designed to accommodate 4 fixing screws up to 8mm diameter The DBC410 can be fixed to the wall without opening the cabinet or removing covers Make sure no dust or other debris enters the device during installation Do not leave the front cover off for any length of time Excessive dust and dirt can degrade the cooling of internal components Allow for Cable Entry Supply load and load control...

Страница 5: ...rol Cables Load control cables can be terminated on the 2 x 4 way terminal strips located directly above the Load terminals The left terminal block is the output for 0 to 10V or DSI if selected by software setup Note that most types of 1 10V HF Fluorescent Ballast control wiring is polarity conscious The terminal of the ballast connects to the left terminal block and the terminal connects to the r...

Страница 6: ... pair paralleled for VE and one pair used for DATA and DATA Recommended Cable Colour Coding Green White pair paralleled for GND Orange White pair paralleled for VE Blue White pair Blue for DATA White for DATA Brown White pair Spare or for Join The colour coding scheme used is not critical as long as the same scheme is used throughout the installation Serial Cable Connecting Method The recommended ...

Страница 7: ...ervice Switch has three functions 1 push Transmit Network ID 3 pushes All Channels 100 Push hold for 4 sec Reboot Top Set This adjusts the maximum output that all other control sources can select ie if the Top Set is fully clockwise 100 selected by a control source will give 100 output If it is fully anti clockwise 100 selected by a control source will give 50 output This control is useful for ext...

Страница 8: ...ol cable from DBC410 to ballasts not installed Check ballast type Check actual wiring against ballast manufacturer s diagram Check 1 10V DSI cable and settings specification Supply 230V 14 50 60Hz Single Phase at 40A Outputs 4 x switched outputs at 10A 4 x signal control outputs selectable to 1 10VDC and DSI Optional Maintained Output 1 x Maintained NC output for testing battery packs in fixtures ...

Отзывы: