Dynalite DBC410 Скачать руководство пользователя страница 2

2

   

DBC410 Installation Manual Rev K.docx

 

features 

 

 

 

Single Phase Supply 

Simple  supply  requirement,  40A  single 
phase. 

 

 

4 Switched Outputs 

Each  10A  output  is  switched  via  a  high 
specification  relay  with  specially  treated 
contacts  which  prevent  contact fusion  when 
switching very reactive loads. 

 

 

4 Control Outputs 

Each  of  the  4  optically  isolated  outputs  can 
be  configured  to  be  either  1-10V,  or  DSI 
Serial  control,  covering  the  latest  types  of 
HF  Fluorescent  Ballasts.  Also  compatible 
with  1-10V  and  DSI  dimmable  electronic 
transformers. 

 

 

MCB Protection 

Each  mains  output  is  protected  by  a  single 
pole magnetic circuit breaker. 

 

 

Many Control Options 

Control  of  this  device  can  be  from  a 
combination  of  methods,  eg.  serial  control 
port,  relay  contacts,  push  button  wall 
stations,  infra  red  receivers  and  timeclocks.  
Easy high-level interface to other popular AV 
control  systems  and  Building  Management 
Systems (BMS) is also available. 

 

 

Simple Installation 

Wall-mount  enclosure  with  mounting  lugs 
facilitates  installation.    Cable  knockouts  are 
provided,  at  the  top  of  the  enclosure  for 
supply  and  load  cables,  with  low  voltage 
(LV) control at the bottom. 

 

  

 

important safeguards 

Warning 

–  this  is  a  class  A  product.    In  a  domestic 

environment this product may cause radio interference, in 
which  case  the  user  may  be  required  to  take  adequate 
measures. 

 

Read  Instructions

 

– We recommend that  you read  this 

Instruction Manual Prior to commencement of installation.  
Retain instructions and give the end user. 

Troubleshooting

  -  If  problems  are  encountered,  check 

the Troubleshooting section on page 8. 

Special  Programming

 

–  Once  powered  and  terminated 

correctly  this  device  will  only  operate  in  basic  mode.  A 
new Dynalite panel will turn on all lighting channels from 
button 1 and turn off from button 4 if network terminations 
are correct. Only once the full network is test correct can 
commissioning  begin.  Advanced  functions  can  be 
commissioned via Envision software. If commissioning is 
required, contact your local distributor for details.   

Check  Connections

 

–  Treat  this  device  as  a 

switchboard  that  has  been  shipped.  Tighten  all  load-
carrying  screw  connections,  as  vibrations  from  transport 
can  cause  MCB  and  terminal  block  screws  to  become 
loose. 

Power

 

Sources

 

–  This  device  should  only  be  operated 

from the type of supply specified on the front panel. This 
device 

must

 be earthed. 

Output  Circuits

 

–  The  load  on  a  circuit  should  not 

exceed  the  specified  capacity  of  10A.    Loads  should  be 
calculated to ensure that the overall maximum capacity of 
40A is not exceeded. 

Load  Control  Circuits

 

–  If  this  device  is  being  used  to 

control  1-10V  or  DSI  HF  Fluorescent  Ballasts,  a  2  core 
mains  rated  control  cable  is  required  to  be  run  to  the 
loads, in addition to the mains feed. 

Load Type

 

– Default settings are for load control outputs 

to be 1-10V.  Check to see what type of HF Fluorescent 
Ballasts  are  in  the  luminaries.    Do  not  terminate  the 
control lines  to  any  DSI  loads  until  the  relevant  channel 
has been programmed as DSI.  When connecting 1-10V 
load control lines, pay attention that the correct polarity is 
maintained. 

Megger  Testing

 

–  Do  not  megger  test  any  circuitry 

connected  to  the  dimming  system,  as  damage  to  the 
electronics may result. 

Mounting Location

 

– This device must be mounted right 

way  up,  on  a  vertical  surface  (refer  to  page  4  for 
mounting instructions).  The specified minimum clearance 
of  100mm for  all  sides  must  be  adhered  to.    Install in  a 
dry,  well-ventilated  location.    Controllers may  emit  some 
mechanical noise.  Take this into account when deciding 
the mounting location. 

Data Cable

 

– The recommended cable for connections to 

the serial port is screened, stranded RS485  data  cable 
with  three  twisted  pairs.  Part  numbers  for  various 
manufacturers are listed on page 6. This cable should be 
segregated from mains cables by a minimum distance of 
300mm. If anticipated cable runs are over 600 metres for 
serial cables, consult your dealer for advice. Do not cut or 
terminate live data cables. 

 

 

Warning 

 

TO REDUCE THE RISK OF FIRE OR 
ELECTRIC SHOCK, DO NOT EXPOSE THIS 
DEVICE TO RAIN OR MOISTURE. 

 

DO NOT ENERGISE UNLESS THE FRONT 
COVER IS IN PLACE. 

 

THIS DEVICE MUST BE EARTHED. 

 

INSTALLATION, PROGRAMMING AND 
MAINTENANCE MUST BE CARRIED OUT BY 
QUALIFIED PERSONNEL. 

 

Содержание DBC410

Страница 1: ...er Installation Manual contents Warning 2 Hardware Controls 7 Features 2 Troubleshooting 8 Important Safeguards 2 Specification 8 Internal View 3 Mounting 4 Supply Load Cable Connections 5 Connecting Serial Control Cables 6 Supplied by ...

Страница 2: ...eck Connections Treat this device as a switchboard that has been shipped Tighten all load carrying screw connections as vibrations from transport can cause MCB and terminal block screws to become loose Power Sources This device should only be operated from the type of supply specified on the front panel This device must be earthed Output Circuits The load on a circuit should not exceed the specifi...

Страница 3: ...pply Connections Knock Out For Low Voltage Cable Entry Glands for Load Cables 225mm 320mm DyNet Network Connections Control CPU Relays Mounting Point Network Socket Service Switch EARTH LINK Depth 75mm Transformer SHEILD GND D D 12V AUX 0V CH 1 CH 2 CH 3 CH 4 N1 N2 N3 N4 LINE 4 LINE 3 LINE 2 LINE 1 For spare parts please call your nearest Dynalite Customer Service Centre and specify DBC410 ...

Страница 4: ...kets are designed to accommodate 4 fixing screws up to 8mm diameter The DBC410 can be fixed to the wall without opening the cabinet or removing covers Make sure no dust or other debris enters the device during installation Do not leave the front cover off for any length of time Excessive dust and dirt can degrade the cooling of internal components Allow for Cable Entry Supply load and load control...

Страница 5: ...rol Cables Load control cables can be terminated on the 2 x 4 way terminal strips located directly above the Load terminals The left terminal block is the output for 0 to 10V or DSI if selected by software setup Note that most types of 1 10V HF Fluorescent Ballast control wiring is polarity conscious The terminal of the ballast connects to the left terminal block and the terminal connects to the r...

Страница 6: ... pair paralleled for VE and one pair used for DATA and DATA Recommended Cable Colour Coding Green White pair paralleled for GND Orange White pair paralleled for VE Blue White pair Blue for DATA White for DATA Brown White pair Spare or for Join The colour coding scheme used is not critical as long as the same scheme is used throughout the installation Serial Cable Connecting Method The recommended ...

Страница 7: ...ervice Switch has three functions 1 push Transmit Network ID 3 pushes All Channels 100 Push hold for 4 sec Reboot Top Set This adjusts the maximum output that all other control sources can select ie if the Top Set is fully clockwise 100 selected by a control source will give 100 output If it is fully anti clockwise 100 selected by a control source will give 50 output This control is useful for ext...

Страница 8: ...ol cable from DBC410 to ballasts not installed Check ballast type Check actual wiring against ballast manufacturer s diagram Check 1 10V DSI cable and settings specification Supply 230V 14 50 60Hz Single Phase at 40A Outputs 4 x switched outputs at 10A 4 x signal control outputs selectable to 1 10VDC and DSI Optional Maintained Output 1 x Maintained NC output for testing battery packs in fixtures ...

Отзывы: