- 3 -
M965563 Rev. 1.3
INSTALL VALVE BODIES
•
INSTALL HANDLES (LEVER and CROSS)
1-1/2''(38mm) MAX.
• Thread LOCKNUT
(8)
to bottom of VALVE BODY
(2)
. Make sure
FIBER WASHER
(9)
and RUBBER WASHER
(10)
are installed.
Insert VALVE BODY
(2)
through mounting hole from underside
of tub deck or mounting surface.
Note: VALVE BODY marked Hot is installed in the left Mtg.
hole, VALVE BODY marked Cold in the right when facing front
of fitting. Maximum mounting surface thickness is 1-1/2" (38mm).
• HANDLE ASSEMBLIES
(1, 1A)
are installed on VALVE BODIES
(2)
and must be removed to install VALVE BODIES
(2)
from under
tub deck or mounting surface.
• To remove HANDLE ASSEMBLY
(1)
, unthread HANDLE BASE
(3)
with LEVER
(4)
from VALVE BODY
(2)
. Pull HANDLE ASSEMBLY
(1)
off VALVE STEM
(5)
.
• Unthread and remove MOUNTING RING
(6)
and SPACER
(7)
.
• From top install SPACER
(7)
onto VALVE BODY
(2)
. Thread
MOUNTING RING
(6)
on VALVE BODY
(2)
until seated tightly against
SPACER
(7)
. Set VALVE BODIES
(2)
so that their outlets are facing
toward SPOUT TEE
(11)
and then tighten LOCKNUT
(8)
using 35mm
or adjustable wrench.
• Insert FIBER WASHERS
(12)
into COUPLING NUTS
(13)
of SUPPLY HOSES
(14)
and tighten making water tight connection.
Important: Loop SUPPLY HOSES (14) as illustrated so they do not kink.
6
1
3
4
8
12
HOT
13
14
9
11
10
7
5
2
"O" RING
TUB DECK OR
MOUNTING SURFACE
Turn VALVE BODIES
(2)
to off position. Align HANDLES as shown or as desired and install HANDLE ASSEMBLY
(1, 1A)
onto
VALVE STEM
(5)
. Thread HANDLE BASE
(3)
onto VALVE BODY
(2)
until seated tightly against mounting surface.
1A
HOT
COLD
3/4" (19mm) D.
3
• Lift HAND SHOWER from HOLDER,
direct spray into tub. Lift TRANSFER KNOB to
check HAND SHOWER and HOSES for leaks.
MAKE WATER SUPPLY CONNECTIONS
• Remove AERATOR from FAUCET.
• With HANDLES in OFF position,
turn on WATER SUPPLIES and check
all connections for leaks.
• Operate both HANDLES to flush
water lines thoroughly.
• Replace AERATOR.
• Connect HOT water supply to LEFT INLET UNION
(1)
and COLD water supply to RIGHT INLET UNION
(2)
.
Pipe connections are 3/4" (19mm) NPT. Use sealant or
Teflon tape on pipe connections.
Do not solder directly to valve body.
TEST INSTALLED FAUCET
3/4" X 3/4" NPT UNION
(NOT SUPPLIED) (19mm X 19mm)
HOT
COLD
3/4" NPT
(19mm)
AERATOR
TRANSFER
KNOB
3/4" (19mm) NPT
(19mm)
2
1
• Turn handles "off" and replace HAND SHOWER.
IMPORTANT: It is strongly recommended
that access be provided for all enclosed
mechanical parts to this system.
3
8
HAND SHOWER
4
4a