- 3 -
M965533 Rev. 1.6 (1/18)
2
2a
HOSE ASSEMBLY
HAND SHOWER ASSEMBLY
• Insert FIBER WASHER
(1)
into COUPLING NUT
(2)
and thread onto T-PIECE and tighten.
• Insert FIBER WASHER
(1a)
into COUPLING NUT
(2a)
of SUPPLY HOSE
(3)
and tighten.
Note: Back flow prevention and 2.5 GPM flow restrictions are included with
all Deck Mount Tub Filler sets with hand shower.
• Drop SPRAY HOLDER
(12)
through ESCUTCHEON
(14)
WASHER
(15)
and into the fifth hole of the tub ledge or mounting
surface (14" [356 mm] max. from SPOUT center) directed towards tub. Install RUBBER WASHER
(16)
and LOCKNUT
(17)
from underside of mounting ledge. Secure SPRAY HOLDER
(12)
by tightening LOCKNUT
(17)
.
• Install SEAL WASHER
(4)
and connect COUPLING NUT
(5)
of BRAIDED HOSE
(6)
to outlet nipple on DIVERTER
(13)
.
Tighten firmly.
• Slip SHOWER HOSE
(10)
with COUPLING NUT
(9)
through installed SPRAY HOLDER
(12)
.
• Install SEAL
(8)
into COUPLING NUT
(9)
. Connect COUPLING NUT
(9)
to HOSE NIPPLE
(7)
and tighten.
• INSTALL second SEAL
(4a)
and connect HAND SHOWER
(11)
to SPRAY HOSE END (
18)
. Hand tighten.
9
2
2a
2a
1
1a
1a
5
6
10
3
3
4
4a
BRAIDED
HOSE
OUTLET NIPPLE
TO HAND SHOWER
7
8
FRONT
14
15
11
17
18
16
13
12