- 3 -
M965629 Rev. 1.3 (5/17)
3
4
HANDLE INSTALLATION
OPERATING THE VALVE
TRANSPOSED SUPPLY PIPING
Sho uld the hot and cold water supply pipes have been transposed
maki ng adjustment impossible, proceed as follow:
• Shut off water supply.
• Remove handle and rim.
• Remove check stops and re-install them transposed.
•
Important note:
RED CHECK STOP is now on the right of
the mixer body and the BLUE CHECK STOP is now on the left.
• Turn the water supply back on and perform the temperature
adjustment in step one.
5
ROLL
PIN
100
2
7
3
4
6
5
1
9
8
10
CHECK STOP
(RED TO BLUE)
CHECK STOP
(BLUE TO RED)
• Push DIAL PLATE
(1)
onto CAP
(2)
until flush against ESCUTCHEON.
• Push TEMPERATURE CONTROL KNOB
(3)
onto KNOB MOUNT
(4)
. Attach TEMPERATURE CONTROL KNOB
(3)
to valve with ATTACHMENT SCREW
(5)
.
• Push HANDLE BASE (6) onto TEMPERATURE CONTROL KNOB
(3)
. Tighten set screw with HEX WRENCH
(7)
to secure HANDLE BASE
(6)
.
• Align HANDLE
(8, 9)
with roll pin and install onto HANDLE BASE
(6)
. Tighten set screw with HEX WRENCH
(10)
to secure HANDLE BASE
(6)
.
1
0
0
2
1
• Rotate handle counter-clockwise from cold to the maximum hot
temperature desired that was preselected in step one.
• If a temperature over 100°F is desired, push the STOP
BUTTON
(1)
down and turn the TEMPERATURE KNOB
(2)
.
This will increase the mixed water temperature up to the
maximum limit previously selected in step one.