background image

 

 

Before you start assembling the antenna, read through the instructions completely, paying special 
attention to the diagrams.  When you unpack the box, do so on a surface where you will not lose 
small parts.  Check the parts against the PARTS LIST, identifying each part carefully. 
 

NOTE: Check to see that all parts are present before beginning assembly. 

 
 
Installation Notes 

 

CHOOSING AN INSTALLATION SITE:

 As with all directional antennas, care must be taken in 

the choice of an installation site for your SkyHawk 3X10.  Select a place clear of power lines or 
other obstructions. The SkyHawk 3X10 should be mounted at least 30 ft (9.1 m) above the ground 
for proper operation.  If the SkyHawk 3X10 is mounted a full-wave above ground, the takeoff angle 
is 14° with a minor lobe at 40° or so.  For a 1/2-wave it’s closer to 20°. At mounting heights below 
1/2-wave the takeoff angle is much greater than 20°. There’s no easy way to calculate it, but there 
are graphs for wave angles at heights of 1/4, 1/8 and so on in any edition of the A.R.R.L. 

Antenna 

Handbook

.  The SkyHawk 3X10 should be able to rotate without hitting anything.  Finally, it 

should not be near any large masses of metal, like metal roofing or siding.  Plan your installation so 
that metallic guy wires are broken up with compression insulators and no other antennas are nearby, 
i.e. dipoles mounted right under the beam. 
 

MASTS AND GUYING:

 In order to avoid coupling between antenna elements and guy wires that 

can de- tune the antenna it may be necessary to break up the guy wires with insulators.  If the 
separation between the antenna and the highest set of guys is less than 15' (4.6m) it would be a good 
idea to use insulators on each of the uppermost guys at intervals of 10' (3m).  Place the first 
insulator on each guy AT THE MAST OR TOWER, for that too is a conductor that can be coupled 
to the antenna by any horizontal or near-horizontal guy wire connected to it. 
 

Rivet Installation 

 
The elements of your SkyHawk 3X10 are assembled with two or three blind rivets per joint.  Blind 
rivets were chosen to provide fast, strong, reliable, vibration proof assembly, with high grip and 
pull-up strengths.  Open end stainless steel rivets are used because they provide better than 80% 
more shear and tensile strength than closed end aluminum rivets.  Blind rivets are easily set by: 
 

1.   Line up the holes in each tube as shown in the diagram. 
 
2.   Insert a blind rivet in each hole. 
 
3.   Making sure the rivet is fully seated, set the rivet with rivet tool. 
 
4.   Repeat step 3 for the other rivets. 
 

If for some reason you need to remove a blind rivet:  Blind rivets may easily be removed by 
drilling through them with a 1/8(3) drill bit.  Be careful not to drill through the entire element and 
be sure to remove any remnants left from the removed rivet.

 

 

 

Содержание SkyHawk 3X10

Страница 1: ...er Tri Band Yagi Antenna DXE 3X10 INS Rev 1b DX Engineering 2017 1200 Southeast Ave Tallmadge OH 44278 USA Phone 800 777 0703 Tech Support and International 330 572 3200 Fax 330 572 3279 E mail DXEngi...

Страница 2: ...d single tower system offers outstanding performance without the headaches of maintaining more substantial antenna farms DX Engineering SkyHawk antenna reflects the latest computer optimized design fo...

Страница 3: ...SS OTHERWISE NOTED Required Tools Rivet tool POP Rivetool PRG 430 POP Rivetool PRGIII or equivalent Flat blade screwdriver Nut Driver 11 32 and 3 8 nut driver Wrench 7 16 and 1 2 Pair of saw horses or...

Страница 4: ...lators and no other antennas are nearby i e dipoles mounted right under the beam MASTS AND GUYING In order to avoid coupling between antenna elements and guy wires that can de tune the antenna it may...

Страница 5: ...anti oxidizing compound should be used JTL 12555 Jet Lube SS 30 is an ideal electrical joint compound that ensures proper electrical connections between aluminum and copper metal parts such as conduc...

Страница 6: ...tion Size Part Number 1 Element Section A 15M 3 4 19 X 47 7 8 1 216 00581RZC 2 Element Section B 15M 5 8 16 X 59 7 8 1 521 00530BAC 2 Element Section C 15M 1 2 13 X 71 7 8 1 826 00532BAC 2 Element Sec...

Страница 7: ...7BBC 1 Element Compensator 1 9 48 X 56 1 422 00562FAC Hardware Qty Description Size Part Number 4 Element Saddle 1 1 4 0053EAC 10 Element Saddle 1 0054EAC 11 Boom Saddle 0555EAC 1 Mast Saddle 0556EAC...

Страница 8: ...8 11 1 4 20 X 2 3 4 PHIL RND HD MS 18 8 2 PROTECTIVE CAP 2 Driven Element Boom Hardware Package 00992SZC consists of the parts listed Qty Description 12 1 4 20 HEX NUT 18 8 7 16 X 7 32 12 1 4 SPLIT R...

Страница 9: ...C element sections and insert the side with the three holes furthermost from the end into one of the B element sections Line up all the holes and secure with three rivets 10 Insert the other C elemen...

Страница 10: ...arker 8 Locate one of the D element or tip sections and insert the side with the two holes furthermost from the end into one of the C element sections Line up all the holes and secure with two rivets...

Страница 11: ...Line up the four holes of the mast saddle with those in the tube above and secure with two 1 4 x 2 3 4 70 screw lock washer and hex nut 8 Attach with the threaded holes up the boom plate to the boom s...

Страница 12: ...om saddle 3 Position an element saddle as shown followed by a 1 4 lock washer and hex nut Tighten only enough so the nut won t fall off two or three turns 4 Slide one side of a driven element through...

Страница 13: ...onto the boom You will find that assembly will be much easier if the boom is supported by a saw horse or similar support at either end Refer to the pictorial on the pullout sheet and the ELEMENT POSI...

Страница 14: ...Element Spacer The element spacers are designed to maintain the relationship between the three driven elements providing unchanging performance under a wide variety of operating conditions They will b...

Страница 15: ...e strap and hardware as shown above Adjust the balun position so there is no strain on the feedline strap 4 Attach the second Balun feedline strap as above 5 Tighten the Balun mounting clamps in place...

Страница 16: ...in flat washers lock washers and hex nuts 5 Slide this assembly over the mast with the top of the large end of the keyhole facing up and securely tighten WARNING IT IS EXTREMELY IMPORTANT THAT EACH N...

Страница 17: ...17 Element Position...

Страница 18: ...18 Element Assembly All dimensions are 1 4 6 Element section dimensions are reference only Dimensions are in inches millimeters unless otherwise noted...

Страница 19: ...19 Boom and Element to Boom Assembly All dimensions are 1 4 6 Element section dimensions are reference only Dimensions are in inches millimeters unless otherwise noted...

Страница 20: ...allation damaged from severe weather including floods or abnormal environmental conditions such as prolonged exposure to corrosives or power surges or by the performance of repairs or alterations outs...

Отзывы: