When assembling any telescoping aluminum tubing sections you should take the following steps: 
 
1.   Make sure the edges are smooth and not sharp. Deburring may be necessary, since burrs and 

shavings can occur on seams as well as edges. All surfaces need to be completely smooth to 
allow easy assembly of tubing sections. 

 

 

 

 

The raised particles and shavings that appear when the aluminum tubing is machined are 
referred to as burrs, and the process by which they are removed is known as deburring.  

 

 

Deburring is a finishing method used in manufacturing. Our aluminum tubing is machine cut on 
both ends and machine slit on one end. Although DX Engineering manufactured aluminum 
tubing is deburred, you should further assure that there are no ragged edges or protrusions.  

 

 

 

Use the 

DXE-UT-KIT-DBR

 for this operation.

 

 

  
 
 
 
 
 
 
 
 

2.   Clean the inside of the aluminum tubing to clear out any dirt or foreign material that would 

cause the aluminum tubing sections to bind during assembly.  Do not use any type of oil or 
general lubricant between the aluminum tubing sections. Oils or general lubricants can cause 
poor electrical connections for radio frequencies. 

 

3.   Clean the outside of the aluminum tubing to clear any dirt or foreign material that would cause 

the clamps to malfunction during assembly. 

 

4.  The use of 

DXE-P8A Penetrox™ A

 is highly recommended. Penetrox™ A is an electrical joint 

compound which effects a substantial electrical connection between metal parts such as 
telescoping aluminum tubing or other antenna pieces. Using Penetrox™ A assures high 
conductivity at all voltage levels by displacing moisture and preventing corrosion or oxidation. 

 

5.   When assembling the aluminum tubing sections, ensure the area is clear of grass, dirt or other 

foreign material that could cause problems during assembly of the closely fitted telescoping 
sections.    

 
Assemble the vertical sections in an area that is flat and has sufficient room for the length of the 
antenna during assembly. Lay the tubing out in descending OD sizes. Orient the slits in the tubes 
toward the top of the antenna. The bottom 2" OD base section has no slits and the feedpoint 
connection hole at the bottom end. Nine of the sections are 36" long, two are 72” long.   

 

 

Caution 

 

Aluminum tubing edges can be very sharp.  

Take precautions to ensure you do not get accidentally cut. 

 

 

Содержание DXE-MBV-1

Страница 1: ...tenna DXE MBV 1 DXE MBV 1 INS Revision 0 DX Engineering 2014 1200 Southeast Ave Tallmadge OH 44278 USA Phone 800 777 0703 Tech Support and International 330 572 3200 Fax 330 572 3279 E mail DXEngineer...

Страница 2: ...5 Assembly 5 Tilt Base to Mounting Pipe 6 Vertical Base Section 6 Base Section to Tilt Base 8 Assembling the Vertical Sections 9 Mating the Vertical Sections to the Tilt Base 13 Raising The Vertical...

Страница 3: ...ANY ANTENNA NEAR POWER LINES IS DANGEROUS Warning Do not locate the antenna near overhead power lines or other electric light or power circuits or where it can come into contact with such circuits Wh...

Страница 4: ...0 058 x 36 Tube Split one end 1 1 4 20 Flanged Nut 2 1 000 x 0 058 x 36 Tube Split one end 1 1 4 20 Nyloc nut 4 DXE ECL 10SS Element Clamp 1 3 8 U Bolt Kits 2 DXE ECL 12SS Element Clamp 1 DXE ECL 16S...

Страница 5: ...aid for feedpoint connection to the vertical antenna system Additional Material Needed but not Supplied Antenna Mounting Steel mounting pipe up to 2 0 OD 0 25 wall thickness 4 feet long The standard 1...

Страница 6: ...o have the steel mounting pipe and the vertical antenna in a secure position Note Galvanized steel rather than aluminum is much more suitable for mounting in concrete Aluminum will quickly corrode due...

Страница 7: ...on Tighten the clamps evenly so the length of the exposed threads is approximately equal Any clamp should be tightened evenly from side to side with an equal amount of thread above each nut Figure 1 V...

Страница 8: ...bly Figure 3 Install the lower section to the insulated channel using the two 2 x 3 8 U Bolts two saddle clamps four 3 8 flat washers four 3 8 split washers and four 3 8 hex nuts as shown in Figure 4...

Страница 9: ...loose Figure 5 Using a wrench or nut driver securely tighten the two Nyloc nuts at the bottom of the patented Tilt Base Then loosen them one half turn each This will allow proper movement of the Tilt...

Страница 10: ...bind up and bend the lower bolts The Tilt Base is not made to support the whole antenna by itself when tilted When the antenna is tilted over ensure you have some sort of table stand or saw horse to s...

Страница 11: ...eneral lubricants can cause poor electrical connections for radio frequencies 3 Clean the outside of the aluminum tubing to clear any dirt or foreign material that would cause the clamps to malfunctio...

Страница 12: ...of the larger element tube section Position one of the element clamps at the very end but not hanging over the edge Make sure the body of the element clamp is positioned between the slits and tighten...

Страница 13: ...12 The top section may be adjusted to vary the length for fine adjustment if necessary Overall height is 35 feet 8 inches Figure 9 Finished Antenna Assembly Drawing not scale...

Страница 14: ...bottom section between the slits and tighten Raising the Vertical DANGER Make sure you have not inadvertently located the antenna underneath power lines Residential power lines are often less than 40...

Страница 15: ...o more than 1 2 turn Once the antenna is fully raised tighten the tilt base hardware Top two Nyloc nuts and two flange nuts Bottom two Nyloc nuts Assembling the UNUN Mounting Bracket Using the 6 hex h...

Страница 16: ...section open the upper and lower custom studded element clamps as shown in Figure 11 Figure 11 Position the UNUN Mounting Bracket so the bottom element clamp is located between the feedpoint hardware...

Страница 17: ...t blade screwdriver or nut driver snug them up as shown in Figure 13 Note position of lower clamp is between the feedpoint hardware and the U Bolt Figure 13 Position the UNUN so it faces forward Tight...

Страница 18: ...located on the base section of the antenna to the terminal on the DXE UN 43 UNUN closest to the Red on the label as shown in Figure 14 Do not over tighten the wing nuts Hand tighten them only do not...

Страница 19: ...connects direct to the SO 239 connector on the DXE UN 43 UNUN Weatherproof this coaxial connection using TRM 06132 Scotch Super 33 and DXE 3M2155 3M Temflex 2155 Rubber Splicing Tape Figure 15 Comple...

Страница 20: ...erformance vertical antenna system Tuners which are built into transceivers lack sufficient impedance tuning range for this type of high performance vertical antenna system The actual impedance of the...

Страница 21: ...are tied to the earth anchors that are screwed into the ground at about the same angle as the ropes will be When using the Tilt Base position the guy wires as shown below This will make it easy to rai...

Страница 22: ...oof NEMA enclosure Silver Teflon SO 239 input connector 2 3 8 x 4 x 4 inches HxWxL DXE UN BRKT UNUN Mounting Kit for Multi Band HF Verticals patented This mounting kit allows you to mount a DXE UN 43...

Страница 23: ...and outside of the cut ends of pipe and tubing Its rotational symmetry allows easy reaming and deburring rough cut tubing edges with minimum effort The UT 2125 is usable on all tubing and pipe sizes f...

Страница 24: ...llowance shall be made for any labor charges of Buyer for replacement of parts adjustment or repairs or any other work unless such charges are authorized in advance by DX Engineering If DX Engineering...

Отзывы: