- 3 -
Parts Included
Description
Quantity
Mount Plate
1
Mast Mount Channel
1
3/8 U-Bolt x 2" ID x 3.25" leg, Saddle & Hardware
2
1/4-20 x 1" Hex Head Bolt
1
1/4" Star Washer
2
DXE-CAVS-1P V-Saddle Clamp
2
DXE-ECL-10SS - Element Clamp
1
DXE-ECL-12SS - Element Clamp
1
DXE-ECL-16SS - Element Clamp
2
DXE-ECL-20SS - Element Clamp
2
DXE-ECL-24SS - Element Clamp
2
Black Vinyl Cap
1
1/4-20 x 2" Hex Head Bolt, full thread
4
Aluminum Spacer
4
1/4-20 Hex Nut
6
1/4" Split Washer
4
1/4" Flat Washer
10
Antenna Element Parts
Quantity
2" (2.00") x 36" Tube, Drilled (slit one end)
1
1-7/8" (1.875") x 18" Tube, Cut, Drilled
1
1-7/8" (1.875") x 36" Tube (slit one end)
1
1-3/4" (1.750") x 36" Tube (slit one end)
1
1-5/8" (1.625") x 36" Tube (slit one end)
1
1-1/2" (1.500") x 36" Tube (slit one end)
1
1-3/8" (1.375") x 36" Tube (slit one end)
1
1-1/4" (1.250") x 36" Tube (slit one end)
1
1-1/8" (1.125") x 36" Tube (slit one end)
1
1" (1.000") x 36" Tube (slit one end)
1
Manual Updates
Every effort is made to supply the latest manual revision with each product. Occasionally a manual
will be updated between the time your DX Engineering product is shipped and when you receive it.
Please check the DX Engineering web site (www.dxengineering.com) for the latest revision manual.
Installation
Site Selection
Select a mounting location clear from power lines, structures and other antennas by a minimum of
34 feet (24 + 10 for the 10 foot safety rule).
Consider overhead power lines, utility cables and
wires
. The further away the vertical is mounted from local noise sources or other metallic objects,
which can re-radiate noise and affect the tuning, radiation pattern and SWR, the better. If you are