Assembling the remaining thread monitor (2-needle machines)
Additional Instructions M-TYPE DELTA - 00.0 - 08/2019
15
Fig. 10: Assembling solenoid valve and RFW PCB (2)
6. Assemble the PCB (8) to the holder (9) using 4 spacers (6).
7. Insert the cable RFW sensor left (10) at slot
X2
on the PCB (8).
8. Insert the cable RFW right (11) at slot
X1
on the PCB (8).
9. Insert the cable (12) at slot
X3
on the PCB (8).
10. Slip 2 jumpers (7) onto the outer pins at slot
X4
.
(6) - Spacer
(7) - Jumper
(8) - PCB
(9) - Holder
(10) - Cable RFW sensor left
(11) - Cable RFW sensor right
(12) - Cable
⑥
⑦
⑦
⑧
⑨
⑪
⑫
⑩