8
MK1 LOUVRE WINDOW (Optional)
Step 2:
On the inside of the shed, position studs
and Nog centrally on window opening.
Make sure the studs are parallel and nail
into Top Plate and End Wall Nog.
Step 3:
Nail wall Sheets to window framing using
30mm clouts. (return to step 4 on page 7
and complete). Then fit Window Frame).
Position Window Frame centrally on win-
dow opening and rivet it to ribs. Pre-drill
holes in each corner and nail Window
Frame to framing, using 50mm nails.
Step 4:
If the Window is in the gable end, tempo-
rarily position the Over Panel above Win-
dow Frame. Following the same angle as
the gable, mark and cut to suit.
Step 5:
Rivet Over Panel to the Window Frame
with rivets.
588mm
Step 1:
Lay out the two window studs (883mm) and
Nog (634mm) on a flat surface. Position
Nog and nail in place using 2x 75mm nails
at each end.
Step 6:
From the inside of the shed, slide Louvre
Glass into Louvre Units attached to the
Window Frame. Bend up tabs to keep
Glass in position.
50mm
NAILS
RIVITS