15
Step 2:
Once door is hung, position the Locking Stays so
they slide into the Locking Brackets easily. Screw
Locking Stays to Door Jamb.
SECURITY DOOR
(Optional)
Step 3
On the left hand Door Jamb, position latch
so that the hook on the door handle will be
secure and go in and out easily. Rivet in
place with four rivets.
RAISED FLOOR MODIFICATION
For sheds being placed on a purpose built floor,
(concrete, cobbles, ply etc.), the Wall Sheets will pro-
trude 20mm below the Base Plate. This will stop water
flowing in between the Base Plate and Floor.
The Floor should be made 15mm smaller than Base
Size.
Note:
Although it is not essential, fitting Damp Proof
Course in between the Base Plate and the Floor
will give added protection against moisture.
CLEAN UP
Remove all swarf
(drill filings) with a soft brush or rag.
Hose down roof and walls thoroughly.
For Coloursteel sheds use touch-up paint provided on all nail heads, rivets and exposed cuts.