14
MK3 FLOOR (Optional)
Step 3:
Re
-
position Floor Board. Lay out remaining Floor
Boards checking around Studs as you go. The
last Floor Board may have to be cut to size.
Step 4:
Nail in each Floor Board, two 50mm nails in each
end and two into Joists. Measure and cut Floor
Flashing (110) to fit in between Door Jamb Flash-
ings and nail in place using 50mm Clouts.
MK3 HASP & STAPLE
Using six rivets and one 50mm clout
attach hasp to Door Jamb Flashing and
the staple to the Door as shown.
(Note: see below for security option)
SECURITY DOOR
(Optional)
Step 1:
Attach
“
T
”
locking handle with two 8x10mm screws.
Slide hook onto square shaft and secure with a
lock washer.
Hook
Lock Washer