MK3A FLOOR
Step 4:
Nail in each Floor Board, two 50mm nails in
each end and two into Joists. Measure and
cut Floor Flashing (A110) to fit in between
Door Jamb Flashings and nail in place us-
ing 50mm Clouts.
14
Step 1:
Attach
“
T
”
locking handle with two 8x10mm
screws TO R/H door (Door without the
weather
-
strip). Slide hook onto square
shaft and secure with a lock washer.
Hook
Lock Washer
Step 2:
Once doors are hung, position the Locking
Stays so they slide into the Locking Brack-
ets easily. Screw Locking Stays to Door
Jamb.
SECURITY DOOR (Optional)
Step 3:
On the back of the left hand
door, position latch so that the
hook on the door handle will be
secure and go in and out easi-
ly. Rivet in place with four riv-
ets.
Left Hand Door
Right Hand Door
Hook
Latch