Duratuf KIWI MK3A Скачать руководство пользователя страница 12

12

 

MK3A DOORS

 

Step 2:

 

Position  right  hand  Door  Track  (B107)  on 
front wall up against underside of Roof, with 
right  hand  end  flush  with  the  right  hand  cor-
ner. Pre

-

drill hole in centre and rivet in place. 

Remove ALL drill filings

 

Step 3:

 

Hang  right  hand  door  in  Door  Track.  At  the 
right  hand  end  of  Door  Track,  adjust  up  or 
down  so  that  the  Door  hangs  parallel  with 
shed. Fit one rivet at right hand end to hold in 
place.

 

Step 4:

 

Position left hand Door Track (A107). Follow Steps 
2  and  3  to  hang  left  hand  Door.  Where  Door 
Tracks meet in the centre, adjust up and down so 
that  the  Doors  fit  snuggly  together,  then  rivet  in 
place. Remove Doors. Pre

-

drill holes into each Rib 

and at similar spacings into Overdoor Flashing. At 
approximately 1/3 in from each end of Door Tracks 
put a 50mm nail. Rivet rest of holes.

 

Step 1:

 

Top  Door  Tracks: 

Mark  the  centre  of  the  door-

way  on  the  Overdoor  Flashing.  Position  Centre 
Door  Stop  on  the  front  face  of  the  Overdoor 
Flashing and up against the underside of roof. Pre

-

drill holes and nail in place with 50mm nails.

 

Step 5:

 

Clean  out  ALL  drill  filings.  Also  make  sure 
the  Wheels  are  cleaned  of  drill  filings.  Re

-

hang  Doors,  then  insert  door  stops  into  the 
pre drilled holes at end of tracks as shown in 
diagram. Tighten with two spanners

 

Door Track

 

Bolt

 

Washer

 

Washer

 

Nut

 

Aluminium

 

Door Stop

 

DOOR

 

GUID

DOOR

 

CLADDING

 

BOT-

PLATE

 

Step 6:

 

Bottom Door Guides: 

Slide Door to corner. Hang Door Guide (A108) on bottom of the Door. Make it flush with 

Corner Flashing. Lift up approximately 3mm so that the Door will Slide freely. Pre

-

drill hole and nail in place us-

ing a 50mm nail. Slide to centre. Ensuring Door slides freely, pre

-

drill hole and nail Door Guide in place. Check 

Door is not binding in the middle then pre

-

drill holes into each Rib at similar spacing into Door Step Flashing. 

Nail off using 50mm nails. Repeat with other Door.

 

Note:

 

For sheds with Raised Base Plate option the Door Step Flashing will protrude down past the Bottom Plate. Attach 
Door Guide with rivets.

 

Содержание MK3A

Страница 1: ...Quality Built In ASSEMBLY INSTRUCTIONS MK3A BASE SIZE 3380mm x 2545mm...

Страница 2: ...hecklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools wit...

Страница 3: ...Fixed Window Frame Glaze Beads Glass Louvre Window Frame Glass Over Panel Window Hardware Pack 2 830m 1 390m 1 390m 0 350m 0 900m 1 Roof Sheets Flat Roof Sheet Clear Roof Panel Pressed Capping Sheet...

Страница 4: ...785 1630 3380 45 45 45 FRONT WALL 883 1900 or 1870 for Raised Base Plate only 45 45 45 1622 1622 3380 45 45 45 1900 or 1870 for Raised Base Plate only BACK WALL 883 YELLOW YELLOW YELLOW YELLOW YELLOW...

Страница 5: ...timber from the packaging may be used to tem porarily brace the frame before rolling it over Position 1 205m End Wall Nogs 883m down from Top Plate and nail in place If fitting a Kiwi Floor fit Floor...

Страница 6: ...Tack on a wall sheet means to use minimum nails hammered partly in to hold Wall Sheets in position Should a Wall Sheet need to be re positioned the nails can easily be prized out If a window is requir...

Страница 7: ...ack in place Re peat with remaining two sheets Step 4 Nailing Off Nail one 30mm Clout each side of the Rib two per Pan into the Top Plates and Bottom Plates Nail Wall Sheets to mid wall Nogs one per p...

Страница 8: ...ill holes in each corner and nail Win dow Frame to framing using 50mm nails Step 4 If the Window is in the gable end temporarily position the Over Panel above Window Frame Following the same angle as...

Страница 9: ...ED WINDOW Optional 9 Follow Steps 2 5 on page 8 MK3A DOOR JAMB CORNER FLASHINGS Step1 Fit Door Jamb Flashing 104 in between Top and Bottom Plates and hard against Stud Attach Door Jamb Flashing with t...

Страница 10: ...m Clout through Rib into the Ridge Beam At the back line up Ribs on the Roof Sheet with the Ribs on Wall Sheet Using one 50mm Clout nail through Rib into Back Top Plate Repeat at the front Note The 6...

Страница 11: ...sure sheet joins are flush at the outside edge then rivet flat sheets to pressed sheets Two rivets per join Centralise Roof at the other end and screw in place Step 4 Ensure Ridge Beam is straight the...

Страница 12: ...ntre Door Stop on the front face of the Overdoor Flashing and up against the underside of roof Pre drill holes and nail in place with 50mm nails Step 5 Clean out ALL drill filings Also make sure the W...

Страница 13: ...Rib MK3A FLOOR Step 1 Place shed in final position Check the di agonal measurements are the same and the shed is level before fitting Floor It is recommended that the shed is anchored down with either...

Страница 14: ...oor without the weather strip Slide hook onto square shaft and secure with a lock washer Hook Lock Washer Step 2 Once doors are hung position the Locking Stays so they slide into the Locking Brack ets...

Страница 15: ...Plate This will stop water flowing in between the Base Plate and Floor The Floor should be made 15mm smaller than Base Size Note Although it is not essential fitting Damp Proof Course in between the B...

Страница 16: ...rried out in accordance with instructions below Should the cladding fail to perform as specified above the liability of Riverlea Group Ltd shall in all cases be limited to replacing or repairing the d...

Отзывы: