Filling Boiler With Water And Purging Air For
Systems With Diaphragm Type Expansion Tanks
Refer to the appropriate diagrams, “Near Boiler Piping” on
page 11 for more information.
1.
Close all zone service valves on the supply and return
piping. Open the feed valve and
fi
ll boiler with water.
Make sure air vent is open. Hold relief valve open until
water runs air free for
fi
ve seconds to rapidly bleed air
from boiler, then let the relief valve snap shut.
2.
Open the zone service valve on the supply pipe for the
fi
rst zone. Open the purge valve on the
fi
rst zone. Feed
water will
fi
ll the zone, pushing air out the purge valve.
Close the purge valve when the water runs air free.
Close the zone service valve.
3.
Repeat step 2 for all remaining zones.
4.
Open all service valves. Any air remaining trapped in
the return lines between the service valves and the
boiler will be pushed towards the air vent when the
boiler is placed in operation.
5.
Inspect piping system. Repair any leaks immediately.
Purging Air For Systems With Conventional
Closed Type Expansion Tanks:
Refer to the appropriate diagrams “Near Boiler Piping” on
page 11 for more information.
1.
Close all zone service valves on the supply and return
piping and close the expansion tank service valve.
Drain expansion tank. Open the feed valve and
fi
ll
boiler with water. Hold relief valve open until water
runs air free for
fi
ve seconds to rapidly bleed air from
boiler, then let the relief valve snap shut.
2.
Open the zone service valve on the supply pipe for the
fi
rst zone. Open the purge valve on the
fi
rst zone. Feed
water will
fi
ll the zone, pushing air out the purge valve.
Close the purge valve when the water runs air free.
Close the zone service valve.
3.
Repeat step 2 for all remaining zones.
4.
Open the expansion tank service valve and the tank
vent. Fill the tank to the proper level and close the
tank vent. Remove the handle from the expansion tank
service valve so the homeowner doesn’t accidentally
close it.
5.
Open all service valves. Any air remaining trapped in
the return lines between the service valves and the
boiler will be pushed towards the expansion tank when
the boiler is placed in operation.
6.
Inspect piping system. Repair any leaks immediately.
START UP
Содержание GWB9-050IH-2
Страница 2: ...2 DIMENSIONS 2 2 Figure 1 Boiler Dimensions...
Страница 12: ...12 NEAR BOILER PIPING Figure 2 Single Zone Boiler Piping...
Страница 14: ...14 Figure 4 Two Zone Boiler Piping With Circulators NEAR BOILER PIPING...
Страница 15: ...15 NEAR BOILER PIPING Figure 5 Primary Secondary Piping And Wiring With Circulators And Domestic Hot Water...
Страница 19: ...19 Figure 9 Diaphragm Type Expansion Tank Piping NEAR BOILER PIPING...
Страница 20: ...20 Figure 10 Conventional Closed Type Expansion Tank Piping NEAR BOILER PIPING...
Страница 24: ...24 Figure 12 Roof Vent Intake Terminations COMBUSTION AIR AND VENT PIPE VENT AIR INTAKE...
Страница 32: ...32 Figure 21 Ladder Wiring Diagram ELECTRICAL WIRING...
Страница 34: ...34 Figure 23 Ladder Diagram for Figure 22 ELECTRICAL WIRING...
Страница 40: ...40 S9381A INTEGRATED BOILER CONTROL OPERATION AND ADJUSTMENTS Table 9 State Code Definitions...
Страница 41: ...41 S9381A INTEGRATED BOILER CONTROL OPERATION AND ADJUSTMENTS Figure 26 Sequence of Operation...
Страница 48: ...48 TROUBLESHOOTING Table 10 Error Codes...
Страница 55: ...55 NOTES...