ph: 519-923-9813 | [email protected]| web: www.dundalkleisurecraft.com
Fig 2a
Fig 2b
Continue around the sides and front of the sauna nailing
it down every 6-8” (15-20cm)
13
Outdoor Pure Cube Sauna
Assembly Instructions
Next snugly fit the roof cap pieces over the trim.
Line up the roof cap pieces so the corners are tight
together and tap them down tightly over the trim pieces
with a rubber mallet.
Using the supplied finishing nails, secure the roof caps
into place.