ph: 519-923-9813 | [email protected]| web: www.dundalkleisurecraft.com
Fig 2a
Fig 2b
Gather your tongue and groove floor boards.
Start with the floor board with a straight edge on the
back, insert the floor boards into the frame ensuring that
they are tight by tapping them together with a rubber
mallet.
4
Outdoor Pure Cube Sauna
Assembly Instructions
Fasten the floor boards into the floor joists and the inner
floor joists with 1 ½” (38mm) screws.
Continue adding the floor boards in the same manner.
You may have to finesse the last board into place.