
9
Installation and Operation of: Drop-In Waterless Well
OPERATION
Step 1
Press power button to turn on unit and place
silcone liner provided in unit
Step 2
After power on the runtime screen appears.
Unit is in “preheat mode”
Select temp setting, Low Mid or High
Step 3
Display changes to “READY” after the Dry Well
reaches temperature for preset.
Step 4
Press power button to turn off unit.