4. Insert the electric suit port into the valve hole on the suit. Make sure to
align the suit port so that the wet connector is facing the direction that you
will be mounting your SBS™.
5.Thread the valve backing on. Be sure not to twist the electrical wiring. Make
sure the overlay fabric and suit fabric are flat and do not twist during
tightening. Hand tighten only; over tightening could cause the electric suit
port to leak.
6. Make sure the O-ring is in the groove on the top of the suit port before
installing the valve.When installing the inlet valve only hand tighten the
valve.
7. Leak check the suit to ensure the installation is water/air tight.
!! WARNING !!
Improper installation could result in a water leak or
flood of the drysuit. Check the installation for any
leaks prior to your dive.
BLUEHEAT™ LINER
The BlueHeat™ Liner is a two layer, breathable garment.The material is an
anit-microbial stretch fleece/lycra designed to remove moisture from the skin.
The inside, next-to-skin material is soft and comfortable.The outside material
is smooth allowing your primary insulation jumpsuit to easily slide over the
surface.The Liner contains four 20 watt heating pads for a total of 80 watts of
heat.These heating pads are made of breathable materials to support natural
18
BLUEHEAT™ SYSTEM__________
UNCONTROLLED IF PRINTED
QSP-711-101
FIG. 9
FIG. 10
Содержание BlueHeat
Страница 1: ......
Страница 29: ...O RING SIZING CHART 28 BLUEHEAT SYSTEM__________ UNCONTROLLED IF PRINTED QSP 711 101 FIG 21...
Страница 30: ...29 UNCONTROLLED IF PRINTED QSP 711 101 BLUEHEAT SYSTEM__________...
Страница 34: ......