background image

Flush Boost

4

Fill Delay

5

Step 3

To store Boost settings wait 5 seconds until 
the icons return to blue.  

Step 1

Measure the ll time after several
full ushes and record an average.

Step 2

Using a at-ended screwdriver 
rotate the ll delay dial to a 
duration suitable to the time 
previously recorded.

This sets the delay period between consecutive ushes to allow the cistern to 
rell. This can be set at a range of time periods between 15 and 120 seconds 
which are visible on the ll delay dial.      

If the ush test carried out in Section 3 failed on either or both ush options 
a Boost can be independently applied to deliver more air to the valve.   

Step 1

Press any rear button once to enter Boost Mode. 
The current boost setting will now be displayed for both full and partial ush.

Step 2

Toggle Boost ON and OFF for full and partial 
ush using the rear buttons.  

OR

FULL

  

PARTIAL

  

OFF

  

ON

  

Содержание Wave S3

Страница 1: ...ator 2016 Thomas Dudley Ltd 13213 iss A WAVE MAIL Thomas Dudley Ltd P O Box 28 Birmingham New Road Dudley West Midlands DY1 4SN TEL 0121 557 5411 FAX 0121 557 5345 EMAIL sales thomasdudley co uk WEBSITE www thomasdudley co uk ...

Страница 2: ...SN www thomasdudley co uk Fixing Template SOLID LINE SELECT CORRECT CUTTING LINE DOTTED LINE Mounting Option 1 Use solid line as cutting guide when fixing directly to panels or walls 205 mm Panel wall fixing hole only Panel wall fixing hole only 116 mm 198 mm 109 mm Mounting Option 2 or 3 Use dotted line as cutting guide when fixing toThomas Dudley bridging tunnel Wave S3 Smart Flush Actuator 2016 Tho...

Страница 3: ...ns below Mounting Option 1 Mounting frame only Install mounting frame directly to wall Mounting Option 3 Mounting frame with bridging tunnel Tunnel is used to clamp mounting frame to wall and provide an internal service aperture as shown Tunnel must be cut to a depth slightly less than the wall thickness to allow for clamping Note Longer screws may be required for larger wall thicknesses not inclu...

Страница 4: ...o Section 4 Boosting Full Flush Connect white clear pneumatic tube to the port marked with a full round symbol Wiring Transformer Wire the transformer to a suitable 3A fused spur Ensure all electrical work is undertaken by a quali ed electrician and is in compliance with all relevant statutory electrical standards Power Up Plug the power jack into the socket in the rear of the unit Note When power...

Страница 5: ...ecutive ushes to allow the cistern to re ll This can be set at a range of time periods between 15 and 120 seconds which are visible on the ll delay dial If the ush test carried out in Section 3 failed on either or both ush options a Boost can be independently applied to deliver more air to the valve Step 1 Press any rear button once to enter Boost Mode The current boost setting will now be display...

Страница 6: ...any cubicle doors are closed Step 3 Immediately before scanning the unit will beep more rapidly and scanning will commence Ensure the area remains in its inactive state for the duration of the scanning procedure Step 4 On completion of the scanning procedure the unit will sound a long beep The ADR is now set just short of the nearest large static object Manual To set a range shorter than the defau...

Страница 7: ...Locking the Unit 7 Step 1 Locate the locking toggles Step 2 Using a suitably sized screwdriver or allen key turn the locking toggles inwards approximately 45 to the lock position ...

Страница 8: ...lluminate red to indicate that ushing is temporarily unavailable When re lled both icons will either illuminate blue if the user is still within range or become inactive if the user has vacated the area Obstruction Warning Flashing red icons indicate that there is an obstacle hindering operation Operation 8 Inactive When a user is outside the activation detection range ADR the icons are not illumi...

Отзывы: