background image

0

BLK

BLK

BRW

",+

BLK

BLU

PNK

RED

BLK

BRW

YEL

BLK

PNK

BRW

BLU

RED

BLU

ORG

ORG

RED

RED

",+

"2

7

"27

MODEL: Dualit QCS-2-800 (4 Tube) - SERIES

THIS DRAWING CONTAINS INFORMATION CONFIDENTIAL TO DUALIT LTD.

NO REPRODUCTION OR DISCLOSURE OF ITS CONTENTS IS PERMITTED.

065266  

09/10/2002

Содержание QCS-2-800

Страница 1: ...CONVEYOR TOASTER MODEL QCS 2 800 QCS 3 1000 Installation and Operation Instructions 2M HG0657 Rev D 6 13 05...

Страница 2: ...out notice Such revisions do not entitle the buyer to corresponding changes improvements additions or replacements for previously purchased equipment MAINTENANCE AND REPAIRS Contact your local authori...

Страница 3: ...8 lbs Dimensions 47 0 cm Width 56 8 cm Depth 39 7 cm Height 18 1 2 Width 22 3 8 Depth 15 5 8 Height CONTENTS Safety Symbols 2 Maintenance Repairs 2 Dualit Contact Information 2 Model Specifications 3...

Страница 4: ...aim immediately with the carrier that handled the shipment Do not operate the unit if it was damaged during shipping ASSEMBLY AND INSTALLATION The QCS 2 800 unit was shipped fully assembled and ready...

Страница 5: ...connect equipment to power without proper earth connections Improper grounding earth may result in personal injury or fatality WARNING DO NOT CUT OR REMOVE THIS PLUG OR GROUNDING EARTH PRONG FROM THE...

Страница 6: ...set them both at HIGH 4 Allow warm up time of 5 to 10 minutes 5 Place a sample product on the conveyor belt to test the settings If toasting is too light turn conveyor speed control counterclockwise t...

Страница 7: ...to carbonize CLEANING Preventive maintenance for your Dualit toaster consists of the following recommended cleaning procedures To keep your toaster in its top operating condition these steps should be...

Страница 8: ...and loosening the set screw 4 Remove the wire from terminal block connecting the drive motor to internal wiring On units rated 208 or 240 volts note which color leads are being used for these connect...

Страница 9: ...52 500 as the drive motor and or speed control may need replacing 8 Replace the enclosure by sliding it forward towards the front of the unit The front edge of the enclosure will slide beneath the toa...

Страница 10: ...LK BRW YEL BLK PNK BRW BLU RED BLU ORG ORG RED RED 27 27 MODEL Dualit QCS 2 800 4 Tube SERIES THIS DRAWING CONTAINS INFORMATION CONFIDENTIAL TO DUALIT LTD NO REPRODUCTION OR DISCLOSURE OF ITS CONTENTS...

Страница 11: ...27 9 27 0 5 2 2 2 27 27 0 2 5 27 27 MODEL QCS 3 1000 4 TUBE PARALLEL THIS DRAWING CONTAINS INFORMATION CONFIDENTIAL TO DUALIT LTD NO REPRODUCTION OR DISCLOSURE OF ITS CONTENTS IS PERMITTED 065607 02...

Страница 12: ...6 15 16 17 18 19 20 22 23 24 25 27 28 29 30 31 32 33 34 36 21 35 3 38 MODEL QCS CONVEYOR TOASTER THIS DRAWING CONTAINS INFORMATION CONFIDENTIAL TO DUALIT LTD NO REPRODUCTION OR DISCLOSURE OF ITS CONTE...

Страница 13: ...16 2R 200709 4 LEG 1 CHROME PLASTIC 17 2P 200736 2 SPRING BUSHING FRONT 18 2P 200700 2 BUSHING FRONT 19 2A 202904 1 SHAFT IDLER 20 SP 160027 1 BELT CONVEYOR 10 X 35 1 2 22 HA 100560 1 TRAY PULL OUT 23...

Страница 14: ...UP 26 2A 200284 1 E CLIP 27 2E 200551 1 SWITCH ROTARY POWER SAVER 28 2J 200538 2 SWITCH INFINITE 29 2P 402728 1 ANTI SPIN PLATE 30 HO 118050 1 SWITCH SPEED CONTROL 500 ohm 31 2E 200566 1 SWITCH HIGH L...

Отзывы: