Installation – Terminal Description
43
CT CONNECTIONS
p1,
k
or K is the primary of the CT that ‘points’ towards the GENERATOR
p2,
l
or L is the primary of the CT that ‘points’ towards the LOAD
s1 is the secondary of the CT that connects to the DSE Module’s input for the CT measuring
(
I1,I2,I3
)
s2 is the secondary of the CT that should be commoned with the s2 connections of all the other CTs
and connected to the CT common terminal of the module.
CT labelled as
p1,
k
or K
CT labelled as
p2,
l
or L
To Supply
To Load