Page
3
DRUCEGROVE Ltd, Unit 12 Abbey Mead Industrial Park,
Brooker Road, Waltham Abbey, Essex EN9 1HU
Phone:
+44 (0) 1992 650486
Fax:
+44 (0) 1992 652226
[email protected]
www.drucegrove.com
Rope Tensioning System
Equator
®
PREPARATION
Check that both gauges are fitted with the correct Hook Bolts/Spring Assemblies and Rope
Locators for the rope diameter to be adjusted.
The rope locators are marked for the range of suitable rope sizes. The hook bolts cover the
same ranges of rope sizes.
HOW TO REMOVE AND REFIT THE HOOK BOLTS
Remove the End Caps by sliding them toward the
hook bolts, then away from the gauge body.
The hook bolts must have their open end facing
outwards.
Remove the non-adjustable hook bolt and
replace with the one suitable for the rope to be ad-
justed. Refit the end cap.
Remove the assembly containing the adjustable
hook bolt, spring and pointer lever peg, by
pulling the assembly outwards.
Hold the pointer in the mid-scale position.
Place the replacement hook bolt spring and peg
assembly halfway into the gauge body.
1
2
3
4
5