background image

5. COMPONENTS 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
6. UNPACKING AND INSTALLATION 

 

6.1  UNPACKING 

Once the suitable location for installation has been identified, open the package and remove the pump. Check that it was not 
damaged during transport or storage. The packaging material does not require special disposal precautions as it is not in any 
way dangerous or polluting. Refer to the local regulations for disposal. 

 

6.2  INSTALLATION 

Pump assembly operations are not required. 
Allow a sufficient amount of space for installation, leaving a minimum perimetric space of 100 mm (3,93 in.). 
For  wall-mounting,  suitable  space  must  be  provided  (see  the  installation  diagram)  to  prevent  abnormal  positions  or  the 
possibility of impacts; fixing holes are provided on the plate (see Para. 12). 
Then,  the  pump  must  be  connected  hydraulically  to  the  machine.  Make  the  connection  to  the  control panel  and  fill  the  tank 
(making sure not to exceed the maximum visual level). 
Empty the tank during the disassembly phase. 
Disconnect the electric part from the hydraulic part. 
 

 
 
 
 
 

PUMP COMPONENTS 

Motor 

Connector 

Pump 

Level indicator (optical in 
the picture – 

 floating 

switch 

optional) 

Filter 

Tank 

Distributor block 

Non-return valve 
(optional) 

By-pass adjustment screw 

10 

Clamping bracket 

11 

Pressure switch (optional) 

12 

Pressure gauge 

13 

Plug 

  12 

  13 

10 

  11 

Содержание 3905000

Страница 1: ...ACTERISTICS 5 COMPONENTS 6 UNPACKING AND INSTALLING 7 OPERATING INSTRUCTIONS 8 TROUBLESHOOTING 9 MAINTENANCE PROCEDURE 10 DISPOSAL 11 ORDERING INFORMATION 12 DIMENSIONS 13 HANDLING AND TRANSPORTATION...

Страница 2: ...versatility when used with press lubrication systems machine tools reducers guides chains etc The DRAGON X pump has a built in release valve and can be used in the following types of systems Lubricati...

Страница 3: ...el connector optical floating switch DIN 43650 Float Level output signal Clean contact 50V max voltage 40 W max power SPDT Contact Pressure switch Contact closed in the case of max calibration pressur...

Страница 4: ...4 4 1 HYDRAULIC SYSTEM The only connection to make is to connect the pump to the point to lubricate or to the metering valves Fig 2 Hydraulic diagram with check valve Fig 1 Hydraulic diagram...

Страница 5: ...mounting suitable space must be provided see the installation diagram to prevent abnormal positions or the possibility of impacts fixing holes are provided on the plate see Para 12 Then the pump must...

Страница 6: ...the level is off see the image below 4 Turn the screw in opposite way until the green led is on At the end of this procedure the level is correctly set It is possible to re do the calibration followi...

Страница 7: ...ions Check the integrity of the pump Check that the pump is at the operating temperature and that there are no air bubbles in the pipes Check that the electric connection was carried out correctly Che...

Страница 8: ...e by pass valve Replace the pump Tighten the adjustment screw until oil comes out of the delivery pipe Replace the by pass valve Connect a pipe that is approx 30 cm long to the pump outlet with a pres...

Страница 9: ...an improper manner Refer to the local regulations for their correct disposal When demolishing the machine the identification plate and all other documents must be destroyed 11 ORDER INFORMATION 11 1...

Страница 10: ...SENSOR LEVEL For the 3L tank 1639201 For the 6L tank 1639202 FLOATING LEVEL INDICATOR For the 3L tank 3133627 For the 6L tank 3133628 DISTRIBUTOR BLOCK 1525370 TANK 3 L 6770033 6 L 6770006 PRESSURE G...

Страница 11: ...11 12 DIMENSIONS CONTROL UNITS A B C D E F G 3L pump 330 146 246 195 152 172 80 6L pump 431 250 347 259 148 172 80 3L 24V pump 312 146 246 173 150 151 75 6L 24V pump 413 250 347 253 150 151 75...

Страница 12: ...ations Electric current Do not carry out any work on the machine before disconnecting it from the electrical power supply and making sure that no one can reconnect it during the operation All the inst...

Страница 13: ...nts and the provisions specified in the machine directive was checked by filling out prepared check lists that are contained in the technical file Two types of lists were used Risk assessment UNI EN I...

Отзывы: