background image

 

 

 

5. UNPACKING AND INSTALLATION 

 

5.1 UNPACKING 

Once a suitable installation position has been identified, unpack the product and prepare for installation. It is important to 

inspect the product to ensure that there has been no damage during transportation. The packaging material used does not 

require any special disposal procedures. You should refer to you regional requirements. 

 

5.2 INSTALLATION 

No pump installation operations are required. 

 

6. OPERATING INSTRUCTIONS 

 

6.1 START-UP OF THE PUMP

 

Before using the product, a few preliminary checks must be performed: 

 

 

The unit can be opened and repaired only by specialized personnel. 

 

Using the pump submerged in fluids or in a particularly aggressive or explosive/flammable environment is prohibited unless 

it has been prepared ahead of time by the supplier for this purpose. 

 

Use gloves and eye protection as required by the sealant safety data sheet. 

 

DO NOT use lubricants that are aggressive to NBR gaskets. If you are unsure, contact the Dropsa SpA technical office. 

 

Never ignore health hazards and always follow sanitary regulations. 

 

Check the integrity of the pump. 

 

Ensure that all the selector switches (5-7-9) are in the “off” position and that the pressure regulators (6-8) are calibrated to 

the minimum. 

 

The presser cylinders pressure regulator (10) is precalibrated for normal use. 

 

Ensure that the flow valve (11A) on the manifold valve (11) is open and that the pressure release valve (11B) is closed. 

 

Connect the pump to the low pressure pneumatic circuit using the quick coupler (3). 

 

Ensure that the pump is at operating temperature. 

 

Connect and check the tightness of the outlet fitting (13). 

 

Connect the earthing cable (14). 

 

6.2 OPERATING PRINCIPLE 

 

The follower plate (1A) built into the pump and inserted in the barrel makes suction easier for the pneumatic pump (1), as 

well as guaranteeing complete emptying of the barrel. 

 

Insertion of the follower plate in the full barrel and extraction of the same when the sealant/grease is depleted is achieved 

by raising and lowering the unit (1) through pneumatic cylinder controls (2) making up the structure stanchions. 

 
 
 

6.3 OPERATING INSTRUCTIONS 
6.3.1 Cart handling 

 

Before moving the pump, rotate the safety foot to the horizontal position (17A). To rotate the foot, push and rotate it 

simultaneously. 

 

Before carrying out any operation on the pump, return the safety foot (17) to the vertical position. 

6.3.2 Installation of the sealant barrel 

 

Move the selector switch (9) to the “up” position, raise the pump (1) to a height sufficient for inserting the barrel and then 

return the selector switch to “off”. 

 

Open the air pressure vent valve (16) located on the follower plate. 

 

Arrange the barrel on the cart platform. 

 

Move the selector switch (9) to the “down” position, lower the pump to the edge of the barrel and then return the selector 

switch to “off”. 

 

Centre the barrel with the follower plate. 

 

Move the selector switch (9) to the “down” position and lower the pump until it is in contact with the grease level. 

 

Move the rear sheet (15) until it is in contact with the barrel wall. Secure the sheet with the appropriate screws. 

 

Move the selector switch (9) to the “off” position. 

 

Close the air pressure vent valve (16) located on the follower plate. 

6.3.3 Sealant pumping 

ATTENTION

: When introducing the follower plate into the barrel, inserting your hands is strictly prohibited.

 

 

Содержание 0400605

Страница 1: ...6 UNPACKING AND INSTALLING 7 OPERATING INSTRUCTIONS 8 TROUBLESHOOTING 9 MAINTENANCE PROCEDURE 10 DISPOSAL 11 ORDERING INFORMATION 12 DIMENSIONS 13 HANDLING AND TRANSPORTATION 14 CLEANING 15 TRAINING...

Страница 2: ...PRODUCT IDENTIFICATION Machine identification label is located on the front side of the reservoir and contains product serial number input voltage and details of the operating parameters 4 TECHNICAL C...

Страница 3: ...3 3 1 PNEUMATIC HYDRAULIC DIAGRAM PNEUMATIC PUMP 100 1 PMAX 700BAR Sealant drum grease Sealant grease outlet Air inlet Pneumatic cylinder Venting Pneumatic pump 100 1 PMAX 700BAR...

Страница 4: ...valve 4 Air Inlet Pressure Gauge 12 Line sealing pressure gauge grease 5 Pump On Off Switch 13 Output sealant fitting grease 6 Pump Pressure regulator 14 Earthing Connection 7 Air Flow lifting ON OFF...

Страница 5: ...temperature Connect and check the tightness of the outlet fitting 13 Connect the earthing cable 14 6 2 OPERATING PRINCIPLE The follower plate 1A built into the pump and inserted in the barrel makes s...

Страница 6: ...MS AND SOLUTIONS A diagnostics table is provided below that indicates the main anomalies the probable causes and the possible solutions If you were not able to solve the problem after consulting the d...

Страница 7: ...POSAL During maintenance or disposal of the machine care should be taken to properly dispose of environmentally sensitive items such as oils or other lubricants Refer to local regulations in force in...

Страница 8: ...8 11 DIMENSIONS 11 1 5 kg pneumatic pump trolley mounted...

Страница 9: ...e material with which the pump is built with the sealant to be pumped See chap 4 An incorrect selection could cause in addition to damaging the pumps and pipes serious risks for people spillage of irr...

Страница 10: ...l Lubricating Grease Institute and the ASTM classification American Society for Testing and Materials for greases for the values that concern the pump For further information about the technical speci...

Отзывы: