DriSteem Ultra-sorb XV Скачать руководство пользователя страница 33

31

ULTRA-SORB MODEL XV INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Pour water into header through dispersion 
tube hole to submerge heat exchanger before 
adding Humidifi er De-scaling Solution.

Heat exchanger 
tube inlet and 
outlet

OM-7492

Fill water

 HEAT EXCHANGER

A poor quality steam source may cause a buildup of deposits on the heat 
exchanger which will require periodic cleaning. After 2000 hours of 
operation, remove a dispersion tube and check whether the heat exchanger is 
coated with material deposits. 

Material deposits can be removed from the heat exchanger with DriSteem’s 
Humidifi er De-scaling Solution, available from your DriSteem representative. It 
is the only cleaner/de-scaler approved for use with DriSteem humidifi ers. Use 
of other cleaners/de-scalers may void your DriSteem warranty. 

The Usage Instructions shipped with the DriSteem Humidifi er De-scaling 
Solution contain important handling, mixing, timing, and pH testing 
information.

The following additional instructions are for Ultra-sorb Model XV humidifi er:

1.  If a float switch is installed: 

–  Note position of orientation mark (see Figure 31-1). Mark must be in 

same position when fl oat switch is re-installed. 

–  Remove fl oat switch; the ½" NPT (DN15) port will be used to drain 

header.

2.  Install a ½" NPT thread drain hose in ½" NPT (DN15) port. After making 

sure hose can reach a bucket or drain, elevate end of hose well above 
connection.

3.  Remove a dispersion tube, and add water to header to submerge heat 

exchanger (see Figure 31-2).

4.  Add 10 ounces of Humidifier De-scaling Solution per foot of header length 

(30 mL of solution per 300 mm of header length). A 12-foot (3660 mm) 
header requires about 1 gallon (3.8 litres) of solution.

5.  After performing de-scaling procedure as described in Usage Instructions 

and before resuming operation: Flush and drain header four times to 
thoroughly remove Humidifier De-scaling Solution from system.

6.  Re-install float switch in port.

 Humidifi er de-scaling solution

 WARNING

Humidifi er De-scaling Solution is 
corrosive.

Read and follow all warnings and 
instructions shipped with the DriSteem 
Humidifi er De-scaling Solution.

MAINTENANCE

See DriSteem’s Humidifi er De-scaling Solution 
on the Accessories and options page (under 
Products) on our website: www.dristeem.com.

Connection end
of header

Important:

 Check position 

of orientation mark before 
removing fl oat switch. Mark 
must be in same position 
after re-installation for fl oat 
switch to function properly.

Orientation mark on 
fl oat switch - normally 
closed (NC) must face 
directly upward.

mc_063011_0945

FIGURE 31-1:     ORIENTATION MARK ON 
FLOAT SWITCH

FIGURE 31-2:    HEADER CROSS SECTION

Содержание Ultra-sorb XV

Страница 1: ...ULTRA SORB MODEL XV Steam Dispersion Panel Installation Operation and Maintenance Manual READ AND SAVE THESE INSTRUCTIONS For pressurized steam applications...

Страница 2: ...on 6 Mounting and support 8 Installation in a cold air stream 8 Placement upstream from an elbow or duct split 8 Installation above valuable equipment 8 Panel support 8 Mounting in a duct 9 Mounting i...

Страница 3: ...d by maximum steam capacity 3 DN80 ange for humidi cation steam from STS humidi er only H Pressurized steam inlet internal thread 3 4 NPT DN20 J Float switch or optional header over ow access port int...

Страница 4: ...ansmitters or humidistats air ow switches and a control cabinet Note the dispersion assembly serial number The serial number will be required to ensure proper identi cation of replacement parts CAUTIO...

Страница 5: ...installed Ensure that each dispersion tube has the seal and spring in place see Figure 3 1 Push the dispersion tube plug end into the top frame hole to compress the spring Seat the seal end in the cor...

Страница 6: ...d electric modulating steam valve Steam trap To condensate return main Ultra sorb Model XV steam dispersion panel Note Dashed lines indicate provided by installer Temperature switch install as close t...

Страница 7: ...rom pressurized steam source Modulating steam valve Insulated steam supply tubing STS humidi er Open drain temper to local code Drane kooler water tempering device Cold ll water Isolation valve by oth...

Страница 8: ...l 10 to 15 3 to 4 5 m Duct high limit humidity control for dispersion locations A B Air ow proving switch Air ow proving switch Duct high limit humidity control for dispersion location C Return air ow...

Страница 9: ...t will impinge directly on a metal surface PLACEMENT IN AN AIR HANDLING UNIT FIGURE 6 1 Location A is the best choice Installing downstream of heating and cooling coils provides the most even ow throu...

Страница 10: ...UPSTREAM FROM AN ELBOW OR DUCT SPLIT Due to Ultra sorb s rapid steam absorption performance installation upstream from elbows or duct splits can be done with con dence See Figure 8 2 INSTALLATION ABOV...

Страница 11: ...ll and screw locations Ultra sorb Model XV must be installed in horizontal air ows only MOUNTING IN A DUCT Mounting anges on both sides of the unit and the header and frame can be used as mounting sur...

Страница 12: ...l If slope cannot be avoided ensure that the slope is toward the drain end of the panel 7 Drill or screw through the header assembly only where shown Screws and drill bits must not penetrate more than...

Страница 13: ...rilling and tapping screws Fastener spacing should not to exceed 6 150 mm When Ultra sorb Model XV is installed in bypass air applications provide additional bracing for the unsupported side s Install...

Страница 14: ...umidistat To prevent over saturation use a high limit duct mounted humidistat Figure 6 1 Mount it 10 to 15 3 to 4 5 m downstream from the Ultra sorb panel and set it at 80 to 90 RH HEAT EXCHANGER PRES...

Страница 15: ...troller The Ultra sorb XV application rmware is different from Vapor logic control Board wiring terminal connections do not have the same functions as used for the Vapor logic controller Please refer...

Страница 16: ...witch operation see oat switch maintenance instructions on Page 31 These instructions must be followed for the oat switch to function properly AIR FLOW SWITCH Air ow indication is required Indication...

Страница 17: ...ve the sensing element When steam surrounds the sensing element the switch will make allowing the steam dispersion panel valve to open Install all wiring according to national and local electrical cod...

Страница 18: ...eem control cabinet Electric Wired to DriSteem control cabinet Yes Wired to control cabinet No optional Yes Temperature switch only Electric 2 The heat exchanger operates continuously 100 Electric tem...

Страница 19: ...distributed through the dispersion header to the humidi er tubes Pressurized boiler steam 5 PSI minimum as used to source the STS unit heat exchanger is also used to operate the Ultra sorb XV internal...

Страница 20: ...RB MODEL XV INSTALLATION OPERATION AND MAINTENANCE MANUAL Controls INSTALLATION FIGURE 18 1 CONTROL CABINET OM 7882 Wiring terminal block 120 208 240 480V to 24 VAC transformer 75 VAC Controller board...

Страница 21: ...ting steam valve Figure 4 2 or STS humidi er Figure 19 1 passes through the steam supply inlet into the Ultra sorb header 2 HEADER Humidi cation steam ows through the insulated header up the High Ef c...

Страница 22: ...This signals the modulating steam valve or STS humidi er control system to stop humidi cation steam from entering the header and prevents further condensate production See the temperature switch senso...

Страница 23: ...d inputs include demand signal and safety interlocks of air ow and header heat exchanger oat switch 1 Upon air handling unit startup Occupied Mode air flow switch enables 2 position On Off normally cl...

Страница 24: ...anel controller will close the shutoff valve and activate a failure alarm contact on the control board and provide LED alarm indication on the controller See Figure 21 DriSteem alarm point to be wired...

Страница 25: ...ight the modulating valve will resume normal control as set by BAS control input 14 If the level remains at above the switch the modulating valve will remain closed 15 The time interval for condensate...

Страница 26: ...ied Mode air flow switch enables modulating control valve Start stop of fan provided by BAS or other control command a If air ow interlock is provided by BAS then the BAS must provide a contact closur...

Страница 27: ...ication Timing of the 3 stage cycle will be over approximately four seconds CONTROL BOARD LED DIAGNOSTIC CODES First Blink long Wiring Interlocks Green OK Yellow Interlock circuit open duct high RH li...

Страница 28: ...each 90 open after 4 minutes actuator end switch then the steam dispersion panel controller will close the shutoff valve and activate the diagnostic alarm contact If the condensate timer cycle 2 minut...

Страница 29: ...a right angle to the airflow See Figure 9 1 9 Check for any other leaks from header connections 10 If a temperature switch is installed control options 2 or 3 with both heat exchanger and humidificati...

Страница 30: ...ll upstream from lter media consult DriSteem or your local DriSteem representative for recommendations OPERATION NON WETTING DISTANCE Non wetting distance is the dimension downstream from the leaving...

Страница 31: ...rating steam trap is hot and makes noise at intervals and the discharge pipe is progressively cooler beginning at the trap HEADER OVERFLOW P TRAP WATER SEAL If this option is used see Optional header...

Страница 32: ...If steam or condensate is evident at the sealing surface replace the seal Inspect insulating material for dirt and smudges gently clean with damp cloth and soapy water or diluted nontoxic biodegradab...

Страница 33: ...DN15 port will be used to drain header 2 Install a NPT thread drain hose in NPT DN15 port After making sure hose can reach a bucket or drain elevate end of hose well above connection 3 Remove a disper...

Страница 34: ...ackage of 5 191170 030 Plug tube end 2 0 package of 1 310261 Plug tube end 2 0 package of 5 191171 030 6 Dispersion tube assembly consult factory 5 1 4 3 2 10 7 8 7 9 6 mc_101410_0835 MAINTENANCE FIGU...

Страница 35: ...age 31 Condensate collecting in header Increase steam pressure through heat exchanger See Optional header over ow P trap water seal on Page 17 Temperature switch downstream from heat exchanger is malf...

Страница 36: ...oses static pressure downstream from Ultra sorb panel Improper sealing where Ultra sorb frame penetrates duct Seal all panel corners and all cracks between panel and ducts anges See Figure 9 1 Space h...

Страница 37: ...e Consult DriSteem to assess whether installed panel is correct for application Condensate collects in duct Foreign matter preventing control valve from closing Clean or replace valve Panel is mounted...

Страница 38: ...36 ULTRA SORB MODEL XV INSTALLATION OPERATION AND MAINTENANCE MANUAL...

Страница 39: ...37 ULTRA SORB MODEL XV INSTALLATION OPERATION AND MAINTENANCE MANUAL...

Страница 40: ...are sought based on breach of warranty breach of contract negligence strict liability in tort or any other legal theory even if DriSteem has notice of the possibility of such damages By purchasing Dr...

Отзывы: