Operating, Maintenance, Commissioning
Page 18
Note:
After completing all procedures, replace the cover guard and close the inspec-
tion doors. Never leave the opened unit unattended at the installation site.
Fault prevention / checklist
Nominal air quantity set
Condensation connection in place
Filters in the unit (
2x coarse particle fi lters, 1x fi ne particle air
fi lter - optional)
All inspection covers installed
Door contact switch checked
Unit is leak-proof; all screws for the inspection covers tig-
htened using a suitable Phillips screwdriver.
FSH (frost protection unit - optional) temperature set
Settings on the overall system
After initial commissioning of the unit, check the supply and extract air valve fl ow rates as
given in the plans.
Measure and record the air quantities.
Decommissioning
Warning:
Serious personal injury may result from improper working procedures.
Decommissioning may only be carried out by suitably qualifi ed and authorised techni-
cians.
Disconnect all electrical connectors from the unit and remove the water and ventilation
connections in accordance with local safety regulations. The unit still contains valuable
materials, as well as substances that may not be disposed of in the residual waste. Please
arrange for your old unit to be taken to a collection point for recyclable materials.