Commissioning
Prerequisites for commissioning
The water, air, electrical and mechanical connections for the comfort ventilation unit must
be carried out in accordance with the installation instructions. This particularly applies to
the insulation of the air pipes and the condensation connection.
Caution:
The unit must not be operated without complete insulation of the air pipes
(exhaust and outside air) as any condensation could damage the individual unit compo-
nents, such as the electronics or the fans.
Initial commissioning
Warning:
Electrically conductive components may cause serious personal injury. Im-
proper working procedures could damage unit components. The initial commissioning
may only be carried out by suitably qualifi ed and authorised technicians.
When the controller is powered on for the fi rst time, it fi rst performs a self-test. (If you are
operating the unit using a 3-stage timer, the version number of the controller appears on
the display when the unit is switched on.)
Fault messages during initial commissioning
Please note that the fi lters can become clogged very soon after initial commissioning of
the unit as the air can contain high levels of dust (construction dust). An error message
is not displayed in this case. Should abnormal sounds occur or condensation form on the
outside of the unit, please arrange for the entire system to be checked by an authorised
technician.