background image

Product Maintenance

BASES and BACKWALLS: To ensure a long life for your acrylic back walls: wipe them off after 

each use with a soft cloth. To clean the acrylic back walls use non-abrasive sprays or cream 

based cleaners. Never use abrasive cleansers, metal brushes or scrapers that could scratch or 

dull the surface.

GLASS: To ensure long lasting life for your glass shower products: wipe them off after each use 

with a soft cloth. Rinse and wipe off the glass using either a soft cloth or a squeegee to prevent 

soap buildup and water spots. To prevent scratching the surface: never use abrasive cleaners 

and cleaning products that contain scouring agents. Never use bristle brushes or abrasive 

sponges.

HARDWARE: To ensure a long lasting finish: wipe off the metal parts after each use with a soft 

cloth. Do not use abrasive cleaners or cleaning products containing ammonia, bleach or acid. If 

accidentally used, rinse the surface as soon as possible to prevent finish peeling or corrosion. 

After cleaning the shiny finishes, rinse thoroughly and wipe dry with soft cloth. Never use 

abrasive sponge or cloth, steel wool or wired brushes

21

MIRAGE-X manual Ver 1 Rev 1  12/2015

Содержание MIRAGE-X SHDR-1948723L Series

Страница 1: ... drawings manuals or any other details please refer to your model s web page on DreamLine com Please read these instructions carefully before installing If you have any questions regarding installation please contact our technical support specialists Monday through Friday 8 00 AM 7 00 PM EST at Phone 1 866 731 2244 Fax 1 866 857 3638 or e mail our technical support group at Support DreamLine com F...

Страница 2: ... support the total weight of the unit Also make sure the walls are at right angles Irregular installation surface level radius corners or improper angle of side walls will result in serious problems for your installation Please note that some adjustments and drilling might be necessary during the installation process 5 Please protect all primary surfaces of the product during installation Never se...

Страница 3: ...ve fallen to the bottom of the box If any parts are damaged or missing please contact DreamLine for replacement The shipping boxes may contain extra parts not used in your model configuration NOTE Retain these installation instructions for future reference 3 MIRAGE X manual Ver 1 Rev 1 12 2015 D 1 8 D 5 16 Drill bit D 3mm Hammer Power Drill Caulk Level Drill bit D 8mm Phillips Screwdriver Pencil M...

Страница 4: ... 0 5mm Bottom Spacer Strip 1pc 6 Ø8 Plastic Wall Anchor 7pcs 15 Allen Wrench 2 5mm 3mm 1 each 7 Countersunk screw ST4 2x40 4pcs 16 Round Head screw ST4 2x30 3pcs 8 Round Head screw ST4 2x20 1pc 17 Wall Profile 1pc 9 Guide Block 1pc Box 1 Glass Box GL 2 Aluminum Acc Box AC 3 Spare Accessory bag 3 each Parts List Boxes Detailed Components Part 1 2 13 14 18 19 3 4 6 7 8 9 10 11 12 15 16 17 20 6 7 21 ...

Страница 5: ...Assembly diagram 5 MIRAGE X manual Ver 1 Rev 1 12 2015 9 5 10 4 11 ...

Страница 6: ...s See Fig 1 for details 2 Subtract 1 16 from your W dimension W 1 16 L L finished cut length Use a miter saw or hack saw to cut your Bottom Guide Rail 03 to the finished cut length L NOTE Cut from the end of the rail that will be on the door side See Fig 2 for details NOTE If it is necessary to drill new attachment holes into the bottom guide rail after cutting to size drill a Ø3 16 hole throughou...

Страница 7: ... the position of the holes on the threshold through the holes in the Bottom Guide Rail 03 NOTE Use a power drill to make the holes using Ø1 8 drill bit for installation into acrylic threshold Ø5 16 drill bit using anchors into a tile threshold Apply silicone to the underside of the Bottom Guide Rail 03 and attach it to the threshold using ST4 2 x 30mm TH screws 16 OR ST4 2 x 40mm TH screws 21 with...

Страница 8: ... onto the Bottom Guide Rail 03 on the stationary panel side using the pre drilled Ø1 8 hole and attach using the ST4 2 x 20 screw 08 Left hand installation shown Cover the screw with the supplied rubber plug See Fig 5 for details 6 Position the Wall Profile 17 against the wall for the stationary panel installation and make it plumb using a level See Fig 6 for details ...

Страница 9: ...position 0 5mm Bottom Spacer Strips 14 beneath both of the bottom corners of the Stationary Glass 01 See Fig 08 for details 7 Mark the Wall Profile s 17 position on the wall and also mark the hole locations for drilling Remove the Wall Profile 17 and drill Ø5 16 6mm holes into the wall Insert the Wall Anchors 06 Apply a bead of silicone to the wall or to the back of the Wall Profile 17 Attach the ...

Страница 10: ...se a level on the Stationary Glass 01 to confirm that it is installed plumb and level 9 Apply silicone to the inside of the Wall Profile 17 and into the Bottom Guide Rail 03 equal to the width of the glass See Fig 9 for details 10 Install the Stationary Glass 01 into the Wall Profile 17 and Bottom Guide Rail 03 See Fig 10 for details ...

Страница 11: ... 4 5 3 5 2 5 1 Left hand L Bracket installation shown 5 1 2pcs 5 5 1pc Rubber pad Wall Anchor 5 2 1pc 5 6 6pcs M5x14 Screw M5 rubber tip set screw Wall Plate 5 3 1pc 5 7 L Bracket ST4 2x40 2pcs 1pc 5 4 6pcs 5 8 Decorative cover L Bracket Assembly 05 components ...

Страница 12: ...mark the holes for drilling Ø3 8 10mm holes and insert the wall anchors Attach the Wall Plate 5 6 using ST4 2 x 40 5 7 screws Re attach the L Bracket 5 3 to the Wall Plate 5 6 and adjust the angle if necessary using the set screws Fig 11 7 11 8 Adjust 3 16 4mm the Stationary Glass 01 to plumb and tighten the screws Attach the Decorative Cover 5 4 Secure the L Bracket 05 to the top of the Stationar...

Страница 13: ...y 10 components pair Fig 12 1 8 1 8 Door Glass inside of shower NOTE DO NOT install the handle onto the door glass until instructed to do so DO NOT lift the glass using the handle This could result in damage to the glass and or serious personal injury Always use an assistant or a professional grade glass suction cup when handling heavy glass 12 Attach the Roller Assemblies 10 to the door glass Mak...

Страница 14: ...oor 02 with the attached Bottom Roller assemblies 10 onto the Bottom Guide Rail 03 See Fig 13 for details NOTE You will need an assistant to hold the door glass in position during the next steps until the door is secured in position with the Guide Block Assembly 09 ...

Страница 15: ... 4 1pc 2pcs M4x4 flat head screw 9 8 1 2 Fig 14 14 Attach the Exterior Slider Bracket 9 1 through the notch of the installed Stationary panel glass 01 as shown in Fig 14 1 using the Gasket 9 2 and Rubber Sleeves 9 3 Next while holding the door glass in place position the sliding guide block onto the door glass and attach the two halves of the Guide Block 09 with the M5 x 10 set screws 9 6 using Al...

Страница 16: ...o the closing edge of the Door Glass 02 Fig 15 2 Apply silicone into the Bottom Guide Rail 03 and install the Bottom Rail Insert 12 Fig 15 3 See Fig 15 for details 16 Measure from the edge of the panel glass to the wall and cut the Bottom Rail Insert 12 to this dimension W 1 16 File off any burrs from the cut end Apply silicone into the Bottom Guide Rail 03 and install the Bottom Rail Insert 12 ...

Страница 17: ...djust the Bottom Rollers 10 as shown The door should operate smoothly and create a good seal with the wall Loosen the Allen Bolt and then rotate the adjusting disk using the Roller adjustment tool 20 as shown Hold the door glass in the desired position and re tighten the allen bolt See Fig 17 for details ...

Страница 18: ... Ver 1 Rev 1 12 2015 Fig 18 1 16 gap 18 Attach the roller Cover Plate 10 8 leaving approximately 1 16 of clearance beneath the bottom rail Re adjust if the plate makes contact with the bottom rail See Fig 18 for details ...

Страница 19: ...R inside 19 Remove the paper strip from the adhesive backing of the Deflector 18 and attach all three strips to the bottom edge of the door glass as shown Attach the Anti water side strip 19 to the edge of the door glass Notch off the inside bottom to fit around the Deflector 18 See Fig 19 for details ...

Страница 20: ... X manual Ver 1 Rev 1 12 2015 Fig 20 20 Apply a good quality mildew resistant silicone along the wall profile and bottom rail Allow 24 hours for the silicone to fully cure before first use See Fig 20 for details ...

Страница 21: ...h or a squeegee to prevent soap buildup and water spots To prevent scratching the surface never use abrasive cleaners and cleaning products that contain scouring agents Never use bristle brushes or abrasive sponges HARDWARE To ensure a long lasting finish wipe off the metal parts after each use with a soft cloth Do not use abrasive cleaners or cleaning products containing ammonia bleach or acid If...

Страница 22: ...TEL 866 731 2244 FAX 866 857 3638 For more information on DreamLine Shower Doors and Enclosure please visit DreamLine com 21 MIRAGE X manual Ver 1 Rev 1 12 2015 ...

Отзывы: