© DreamLine
®
All Rights Reserved
© DreamLine
®
All Rights Reserved
Tools Needed
Parts Needed
ENCORE-X Shower and Tub Door Manual Ver 1 032020
10
©2020 DreamLine® All Rights Reserved
OR
TIP
Use a metal file
to deburr the
cut end
W-Bottom
(L)
*finished cut length
________”
(-) 3/4” =
(cut 3/8”equally from
both ends)
W
bot
- 3/4”
(L)
(L)
(L)
!
The
Bottom Guide Rail (#15)
must be
cut equally from both ends in order to
keep the center guide holes centered.
NOTE
The
Bottom Guide Rail (#15)
will be shorter than the top guide rail
because it fits between the
Wall Profiles (#01)
; To keep the
Guide Block
(#05)
holes centered, it is necessary to cut the
Bottom Guide Rail (#15)
equally from both ends.
W
bot
=
Finished
Opening
Width
(L)
= Finished Cut Length
Guide Block (#05)
centered
Fig 3a
Fig 3b
Fig 3c
C
L
15
x1
C
L
C
L
3/8”
(10mm)
3/8”
(10mm)
wall
wall
(cut 3/8”equally
from both ends)
3