3A
4A
4.
Fasten the Wall Cups to the wall with screws AND double-sided adhesive tape (4A & 4B).
NOTE : Ensure that they are aligned vertically, so that the Wall Cups at the top are directly above the ones at the bottom.
3C
3B
4B
Floor
Wall
Wall
Wall
Wall
Wall
Wall
INSTALLATION
3.
To Install, place the gate in the opening so that the bottom of the Gate Frame is completely flat on the floor
(3A),
and it is perpendicular
to the openings and the floor
(3B & 3C)
.
J
x 4
If the safety barrier is used at the
bottom of the stairs, it should be
positioned at the front of the lowest
tread possible.
5.
For use on stairs
(5A & 5B)
.
Bottom of stairs
Floor
Top of stairs
Landing
Side view of gate
Top view of gate
If the safety barrier is used at the top of
stairs, it should not be positioned below
the top level.
At the top of landing, position the gate
6in (15cm) away from the top step.
Wood screws (J) included.
For Brick or Masonry use the appropriate fittings, screws
and plugs for your wall (not included)
Never use without wall cups.
Screws MUST always be used
to install wall cups.
G x 4
H x 4
J x 4
Never use without wall cups.
Screws MUST always be used
to install wall cups.
5
15cm
6in