Draper Premier XL 220 Скачать руководство пользователя страница 3

Section 3 -

 Operation

Please Note:

 Before fully operating screen: For Targa, remove tape; on Premier, lower viewing surface enough to fully expose shipping brackets, then remove shipping 

brackets by loosening screws, removing end shipping brackets, sliding center shipping brackets off dowel, and re-tightening screws 

(Fig. 3)

.

220V AC Single Station Control —

 3-position up-off-down switch permits operation to be stopped at any point. Factory adjusted 

limit switches automatically stop screen when fully down or fully up.

220V AC Multiple Station Control —

 Switches similar in appearance to 110-120V Single Station Control. Screen stops when switch 

is released and may be restarted in either direction. Factory adjusted limit switches stop screen automatically when fully down 

or fully up.

For LVC-IV Controls:

24V Control —

 Three-button up-stop-down switch

(es)

 stop at any point desired, operate in any sequence.  

Factory adjusted limit switches automatically stop screen when fully down or fully up.

1. 

The key-operated power supply switch controls power to unit and switches.  

When it is “off”, switches will not operate. Key may be removed from switch  

in either “on” or “off” position.

2. 

A three-position key switch permits screen to be operated directly by key.  

In this case, screen operator must always have a key.

RS232 / Ethernet —

 Serial communication and network communication available.

Plug & Play

TM

 —

 Supplied with a 294.64cm cable lead. No wiring is necessary.  

Screen is equipped with a handheld remote or 3-position operating switch.  

Three positions 

(up-off-down)

 permit operation to be stopped at any point.  

Factory adjusted limit switches automatically stop screen when fully down or fully up.

Section 4 -

 Tab Tension Adjustment Procedure

CAUTION:

 Do not touch or bend surface.

 Determine which side requires adjustment.

 Secure dowel with one hand.

 Using Phillips-head screwdriver, depress spring-loaded adjustment screw and slowly 

turn CLOCKWISE TO INCREASE tension, or COUNTER-CLOCKWISE TO RELEASE 

tension. The screw adjusts in ¼ turn increments. Adjust only one increment 

(¼ turn)

 

at a time.

 If problem is not corrected, leave screen in position for 24 hours to allow surface 

material to stretch into position.

 If problem still is not corrected, repeat steps 2 and 3.

Section 2 -

 Hanging Screen 

General:

1. 

Screen should be lifted into position only by end mounting brackets. Keep case level by lifting end plates 

simultaneously to prevent surface damage. Never attempt to lift screen along its length.

3. 

When locating viewing surface and checking clearance for screen’s operation, remember surface is 

centered in case. Handle case carefully to protect its finish.

4. 

Regardless of mounting method, screen should be positively and securely supported so that vibration or 

even abusive pulling on viewing surface will not cause case to work loose or fall. Installer must insure that 

fasteners used are of adequate strength and suitable for mounting surface chosen.

Ceiling and Wall Installation:

CAUTION:

 Product is very heavy: Installer must provide adequate attachment hardware and 

anchors as required. Installer must also insure that structure is of adequate strength.

CAUTION:

 Case must be mounted low enough from ceiling to gain access to bracket screws.

Please Note:

 Do not use a power screwdriver to tighten screw. Maximum torque for tightening 

screw is 5 lb-inches.

PUSH & TURN

CLOCKWISE

to INCREASE TENSION

PUSH & TURN

COUNTER-CLOCKWISE

to RELEASE TENSION

END OF 
DOWEL

END OF 
DOWEL

Figure 2

Figure 3

page 3 of 7

Premier XL

® 

/

 

Targa XL

® 

220V

Electric Projection Screen

Содержание Premier XL 220

Страница 1: ...Control Unit LVC IV 6 Section 10 Dimensions and Methods of Installation 7 CAUTION Read and understand all warnings Page 2 of this document before beginning installation TOOLS REQUIRED PENCIL POWER DR...

Страница 2: ...d 3 Do not affix unit to wall or ceilings that have inadequate strength to permanently hold unit during use It is owner s and installer s responsibility to confirm wall or ceiling to which unit attach...

Страница 3: ...y up Section 4 Tab Tension Adjustment Procedure CAUTION Do not touch or bend surface 1 Determine which side requires adjustment 2 Secure dowel with one hand 3 Using Phillips head screwdriver depress s...

Страница 4: ...ternal Low Voltage Controller Please Note Screen limits are factory set for optimum performance of screen Any adjustment of these limits could void warranty Please check with Draper prior to resetting...

Страница 5: ...nnected to set limits using the wall switch Dry Contacts Back of Wall Switch Back of Wall Switch MOTOR DATA CABLE OR Please Note This Splitter Jack is located inside the junction box of your Access sc...

Страница 6: ...hite Common to screen 230V AC Neutral Red to screen directional Brown to screen directional Yellow to 230V AC Hot Black to 230V AC Hot Green Yellow Ground Blue Common Black Up Brown Down Green Yellow...

Страница 7: ...adequate attachment hardware and anchors as required Installer must also insure that wall or ceiling structure is of adequate strength B 171 5mm 101 6mm 39 7mm 17 5mm 9 5mm 6 35mm 171 5mm R73mm 85 7mm...