Contents
Overview
Components .....................................................................................1
Please Read
Warnings and Safety Information ..................................................2
Please Read
Field Adjustments, Cleaning and Maintenance ............................2
Section 1
Electrical Connections ...................................................................2
Section 2
Hanging Screen ...............................................................................3
Section 3
Operation ..........................................................................................3
Section 4
Tab Tension Adjustment Procedure ...............................................3
Section 5
Limit Adjustments
(Motor with Internal Low Voltage Controller)
..............................4
Section 6
Limit Adjustments
(Standard Motor)
.............................................4
Section 7
Wiring Diagrams...............................................................................5
Section 8
Wiring Diagrams
(continued)
..........................................................6
Section 9
Accessing Built-In Low Voltage Control Unit
(LVC-IV)
.................6
Section 10
Dimensions and Methods of Installation .......................................7
CAUTION
Read and understand all warnings
(Page 2 of this document)
before beginning installation.
TOOLS
REQUIRED
PENCIL
POWER DRILL
TAPE MEASURE
LEVEL
HARDWARE
(by others)
Overview -
Components
If you have any difficulties installing or servicing your
Premier XL / Targa XL, call your dealer or Draper, Inc.
1
Mounting holes
2
Junction Box cover
3
Dowel
4
Front Cover
(Targa Pictured)
1
2
3
4
Premier XL
®
/
Targa XL
®
220V
Electric Projection Screen
INSTRUCTIONS
INSTALLATION & OPERATION
Draper, Inc. | 411 S. Pearl St. Spiceland, IN 47385
draperinc.com | 765.987.7999 | 800.238.7999
© 2019 All Rights Reserved
|
FORM: PremierXL_TargaXL_220V_Inst19