6
REFRIGERATION
There are three available refrigeration piping options: stan-
dard, rear, and top-piping.
Standard piping penetration is located at the front-right
area of the case, fully visible in front of the fan plenum.
Rear piping penetration is located at the rear-right area,
consisting of a pre-cut access punch-out, exposing the
foam material that must be penetrated prior to pipe join-
ing (Fig. 11). If top piping is utilized, piping stub-outs are
located at the top-back-right of the case.
If hot gas defrost is utilized, suction lines to each case in
the circuit should be of equal distance from the main suc-
tion line. The expansion valve and other controls are locat-
ed on the left-hand side of the case and are accessible by
lifting the two left-hand deck pans—lifting the fan plenum
is not required.
Before operating the case, be certain to remove the ship-
ping blocks (Fig. 12) that protect the refrigeration lines dur-
ing shipping. If it becomes necessary to penetrate the case
tank in any area, be certain to seal any open gaps after-
wards with canned-foam sealant and white RTV.
CASE CONNECTIONS
ATTENTION!
If brazing is necessary, place wet rags
around the area to avoid tank damage.
Fig. 12 Remove the shipping blocks
REMOVE
Fig. 11 Penetrate foam as needed to access piping
ACCESS
PUNCH-OUT
ORZ
(ORZ shown. For piping locations in other case models,
see Appendices A–D.)
41 7/16 in [105.2 cm]
81 in
[205.7 cm]
83 in
[210.8 cm]
42 1/16 in [106.8 cm]
COIL
PLENUM
30 3/8 in [77.2 cm]
59 in
[149.9 cm]
62 3/8 in
[158.4 cm]
(Door Height)
64 3/8 in
[163.5cm]
(Frame Height)
C L
29 3/16 in
[74.2 cm]
WIRING TO THE TOP
(OPTIONAL)
28 1/2 in
[72.4 cm]
1 1/2" PVC DRAIN
CONNECTION
28 5/8 in
[72.7 cm]
38 1/8 in
[96.8 cm]
REFRIGERATION
1 1/2 in
[3.8 cm] {END}
8 11/16 in [22.1 cm]
FRONT OF CASE
5 1/8 in
[13.1 cm]
16 1/4 in
[41.2 cm]
7 1/2 in
[19.1 cm]
29 3/16 in [74.2 cm]
38 1/8 in [96.8 cm]
NOTES:
* STUB-UP AREA
** RECOMMENDED STUB-UP CENTERLINE FOR ELECTRICAL AND HUB DRAINS
• ENDS ADD APPROXIMATELY 1 INCH TO CASE HEIGHT
• WIRING-TO-THE-TOP- ADDS APPROXIMATELY 4 INCHES TO CASE HEIGHT
• A 2" MINIMUM AIR GAP IS REQUIRED BETWEEN THE REAR OF THE CASE AND A WALL
• SUCTION LINE (2DR & 3DR) 5/8", SUCTION LINE (4DR, 5DR & 6DR) 7/8"
• LIQUID LINE (ALL LENGTHS) - 3/8", LIQUID LINE w/ HOT GAS DEFROST (ALL LENGTHS) - 1/2"
• AVAILABLE SHELF SIZES: WIRE SHELVES 16", 18", 20", 22" & 23 1/2"; SOLID SHELVES 18", 20", 22", 24" & 27"
• TOP SHELF MUST BE 24" OR SHORTER WHEN USING 27" SHELVES
• RECOMMENDED CONFIGURATION IS 1 - 24" SHELF AND 4 - 27" SHELVES BELOW TOP SHELF
• DASHED LINES SIGNIFY AREA INSIDE BASE RAIL BEHIND KICK-PLATE
60 in [152.4 cm] {2 Door}
90 in [228.6 cm] {3 Door}
120 in [304.8 cm] {4 Door}
150 in [381.0 cm] {5 Door}
180 in [457.2 cm] {6 Door}
4 in [10.2 cm]
42 1/16 in
[106.8 cm]
STREAMLYNE BUMPER OPTION
7 in
[17.7 cm]
1/2 BUMPER OPTION
7 7/8 in
[20 cm]
6 7/16 in*
[16.3 cm]
35 in
[88.9 cm] **
ELECTRICAL
JUNCTION BOX
(WIRING PER LOCAL CODES)
24 in
27 in
27 in
27 in
27 in
3 1/8 in [7.9 cm]
REAR REFRIGERATION
(14" OFF OF FLOOR)
PIPING TO THE TOP
(OPTIONAL)
8 in [20.3 cm]
14 in [35.6 cm]
Содержание Hillphoenix ONRZ
Страница 23: ...ELECTRIC DEFROST 1 PHASE E2 ELECTRICAL WIRING ...
Страница 24: ...E3 ELECTRIC DEFROST 3 PHASE ELECTRICAL WIRING ...
Страница 25: ...E4 ELECTRIC DEFROST HOT GAS ELECTRICAL WIRING ...
Страница 31: ...J2 SEISMIC BRACKETS 5 BRACKETS ...
Страница 32: ...J3 SEISMIC BRACKETS 7 BRACKETS ...
Страница 33: ...J4 SEISMIC BRACKETS 11 BRACKETS ...
Страница 34: ...J5 SEISMIC BRACKETS 15 BRACKETS ...