5
CASE INSTALLATION
Fig. 7 Steamlyne bumper alignment pin
SCREW
BUMPER
ALIGNMENT
PIN
Fig. 8 Front panel joint trim
FRONT PANEL
JOINT TRIM
ing on the case, install the external bumper joint on
the Streamlyne bumper. Simply slide the joint over the
bumper for either case-to-case or case-to-end joints.
5.
Place the hook of the Streamlyne bumper on the lip
of the master bumper bracket and rotate the bumper
down while pushing it in (Fig. 7). When the top edge
of the bumper has slipped under the color band, be
certain that it is pushed in as far as it will go.
6.
Attach the bumper to the tank with the screws provided.
Insert the bumper alignment pin into the underside of
the bumper to align it to the bumper on the next case.
7.
If non-insulated acrylic partitions are included, see
Ap-
pendix L
for installation instructions.
8.
Re-install shelves (or peg hook assemblies if applica-
ble). Be aware that differing shelf configurations will
affect energy consumption and case performance. If
peg hook assemblies are included, see
Appendix N
for installation instructions.
9.
Properly align the front panels as needed, then install
the front panel trim (Fig. 8).
10.
Fasten the door-frame joints to the adjoining door
frames using the supplied T-bolts.
11.
Using the screws provided, install the upper kickplate
retainer and the "J" rail, both of which are shipped
loose in the case (Fig. 9). The kickplate brackets are
pre-installed at the factory.
12.
Insert top of kickplate into the kickplate retainer. Slide
the kickplate up into the retainer, then down onto the
“J” rail (Fig. 10). Be certain that the bottom of the kick-
plate is fitted over extruding "lip" of the "J" rail.
13.
Install end kickplates with screws provided and insert
plug buttons.
14.
Insert nose bumper into master bumper channel. Roll
nose bumper into channel along entire lineup, up to
96’. We recommend leaving an additional 6" of nose
bumper at the ends to allow for shrinkage during the
first 24-48 hours following case start-up.
15.
After sufficient time has passed to allow for bumper
shrinkage, cut away the excess bumper for final fit and
finish. Be certain to use an appropriate cutting tool
(tubing- or PVC-cutter) to ensure a smooth cut.
16.
If case top fascia is included, see
Appendix G
for in-
stallation instructions. If electronic display modules are
included, see
Appendix M
for installation instructions.
Fig. 10 Kickplate installation
1.
Slide kickplate UP into
kickplate
retainer
recess.
2.
Drop the kickplate
DOWN onto the "J"
rail lip.
KICKPLATE
2
1
KICKPLATE
RETAINER
Fig. 9 "J" rail installation
"J" RAIL
1
2
1.
Attach the kickplate
retainer.
2.
Attach the "J" rail to
the kickplate bracket.
Содержание Hillphoenix ONRZ
Страница 23: ...ELECTRIC DEFROST 1 PHASE E2 ELECTRICAL WIRING ...
Страница 24: ...E3 ELECTRIC DEFROST 3 PHASE ELECTRICAL WIRING ...
Страница 25: ...E4 ELECTRIC DEFROST HOT GAS ELECTRICAL WIRING ...
Страница 31: ...J2 SEISMIC BRACKETS 5 BRACKETS ...
Страница 32: ...J3 SEISMIC BRACKETS 7 BRACKETS ...
Страница 33: ...J4 SEISMIC BRACKETS 11 BRACKETS ...
Страница 34: ...J5 SEISMIC BRACKETS 15 BRACKETS ...