![Dover Hillphoenix DI-H Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/dover/hillphoenix-di-h/hillphoenix-di-h_installation-and-operation-manual_2524910020.webp)
Have you thoroughly examined the case for shipping damage? (see pg. 11)
Have you checked the horizontal level of the case? (see pg. 13)
Have you checked that all T-8 light caps and holders are positively engaged?
(see pg. 14)
After powering-up the case, be certain that all of the steps listed below have been
completed to ensure proper case functionality, safety and compliance with war-
ranty terms.
1.
Check all lights and heating elements to ensure they are all functioning
properly.
2.
Check case temperature and adjust controller as needed.
Before powering-up the case, be certain that all of the steps listed below have
been completed to ensure proper case functionality, safety and compliance with
warranty terms.
PRE-POWER CHECKLIST
16
Содержание Hillphoenix DI-H
Страница 2: ...ii ...
Страница 5: ...Revision History new manual format_08 21 T 8 connectors notice after shipping_09 21 v ...
Страница 26: ...A1 Wiring Information B1 B3 Parts List APPENDIX ...
Страница 27: ...A1 WIRING DIAGRAM TBD ...