Dover Ebsray R75 Скачать руководство пользователя страница 5

Publication No.: 2750-17 

 

SECTION 4 - OPERATION

 

 

4.1 

PRE-STARTUP CHECKLIST 

a) 

Check the alignment of the pipes to the pump.  Pipes 
must be supported so that they do not spring away or 
drop down when the pump flanges or union joints are 
disconnected.

 

b) 

Install pressure gauges in the 1/4" NPT ports located 
on the pump casing. These can be used to check the 
actual inlet and discharge conditions after pump start-
up. 

c) 

Inspect complete piping system to ensure that no 
piping loads are being placed on the pump. 

d) 

Secure appropriate hose connections. Check entire 
piping system not leaking. 

e) 

Check shaft rotation and freedom of shaft rotation. 

f)         Open inlet and discharge valves. 

 
 

4.2 

COMMISSIONING/STARTUP PROCEDURE 

1. 

Open the shut-off valve in the bypass return line. 

2. 

Open the tank outlet valve (same as pump inlet valve). 

3. 

Start the pump. Confirm proper pump rotation by 
checking the pump rotation arrow on the cover. 

4. 

Check the pump speed. Pump speed must never 
exceed the recommended maximum. Refer to SECTION 
2.2 of this manual. 

5. 

Check the pressure gauges to ensure the system is 
operating within expected parameters. Record the 
gauge readings in SECTION 2.3 of this manual for future 
reference. 

6. 

Inspect piping, fittings, and associated system 
equipment for leaks, noise, vibration and overheating. 

7. 

Close the discharge valve and check the differential 
pressure. It must not exceed the pressure setting of the 
external bypass valve. 

 

 
 
 
 
 

 
 
Inspect pump frequently during the first few hours of operation 
for  such  conditions  as  excessive  heating  of  ball  bearings, 
vibration or unusual noises.

 

 

 

NOTE: 

Consult SECTION 7 of this manual if difficulties during 

start up are experienced and troubleshooting is required. 

 
4.3 

PERIODIC INSPECTION 

Periodic inspection  of  the  Pump,  Pump  System and  Ancillary 
Equipment  is  required  to  maintain  safety,  conformity, 
operational functionality and reliability.  

If  any  abnormal  condition  is  discovered,  cease  operation  of 
pump immediately and take action to rectify the problem. 

For safe operation, the following items should be included in the 
routine periodic inspection: 
 

1.  Inspect the system for leaks, vibration, abnormal noises, 

and signs of overheating or discolouration. 

2.  Inspect coupling assembly for signs of wear, overheating 

or discolouration 

3.  Check Pump differential pressure 
4.  Check Motor Current. 
5.  Inspect motor for vibration, abnormal noises, and signs of 

overheating or discolouration. 

 
 

 

Operation without guards in place can 
cause serious personal injury, major 
property damage, or death. 

 

Do not operate 

without guard 

in place 

 

 

 

 

Failure to relieve system pressure prior 
to performing pump service can cause 
serious personal injury or property 
damage.

  

Systems with meters will still 

be pressurized even after the hose is 
emptied

 

 

Hazardous pressure 

can cause serious 

personal injury or 

property damage

 

 

 

 

Disconnecting fluid or pressure 
containment components during pump 
operation can cause serious personal 
injury or property damage.

 

 

Hazardous pressure 

can cause serious 

personal injury or 

property damage 

 

 

 

Pumps operating against a closed valve 
can cause system failure, personal 
injury and property damage  

 

Hazardous pressure 

can cause personal 

injury or property 

damage 

Содержание Ebsray R75

Страница 1: ...rsonal injury death or major property damage Warns of hazards that CAN cause serious personal injury death or major property damage Warns of hazards that CAN cause personal injury or property damage NOTE Indicates special instructions which are very important and must be followed 1 3 ESSENTIAL HEALTH SAFETY REQUIREMENTS This publication is intended to assist those involved with the installation op...

Страница 2: ...ION 2 3 If replacement parts are needed or if information pertaining to the pump is required this data must be furnished to an Ebsray representative The R75 pump is listed by Underwriters Laboratories for liquefied petroleum gas service 2 2 TECHNICAL DATA Maximum Operating Temperature 135 C 275 F Maximum Pump Speed 3450 RPM Maximum Differential Pressure 1400 kPa 14 Bar Maximum Working Pressure 292...

Страница 3: ...ransit should be noted on the packing note and on both your own and the carrier s copy of the consignment note Should a shortage be evident on receipt notify Ebsray immediately giving full details and packing note number Additionally a claim should be made with the transport company When received on site the pump set must be stored in a dry covered area NOTE Never allow water or any corrosive prod...

Страница 4: ...TO driven Hydraulic motors should be well supported with their shafts parallel to the pump shaft in all respects Ebsray provides an optional close coupled hydraulic motor adapter The adapter provides for straight alignment of a hydraulic motor drive through a coupling connected to a straight key pump shaft 3 9 PUMP INTERNAL RELIEF VALVE NOTE The pump internal relief valve is designed to protect th...

Страница 5: ... such conditions as excessive heating of ball bearings vibration or unusual noises NOTE Consult SECTION 7 of this manual if difficulties during start up are experienced and troubleshooting is required 4 3 PERIODIC INSPECTION Periodic inspection of the Pump Pump System and Ancillary Equipment is required to maintain safety conformity operational functionality and reliability If any abnormal conditi...

Страница 6: ...ust be fully flushed out i e returned in the state it was provided Numbers in parentheses i e Cover 2 following individual parts indicate reference numbers specified in SECTION 6 Steps before disassembly 1 Obtain the appropriate Work Permit if required 2 Isolate power supply to motor if fitted 3 Isolate pump from liquids in inlet and discharge lines depressurise and purge out any toxic flammable c...

Страница 7: ...tridge 10 Fit the smallest new O ring 48 to the Seal Seat and lightly lubricate 11 Without removing the protective cover press the Seal Seat into the Cartridge with fingers ensuring complete and square engagement 12 Remove the protective cover from the Seal Seat clean with non residue contact cleaner 13 Fit the new O rings 57B 57C to the Cartridge and lightly lubricate The smaller cross section O ...

Страница 8: ...ubricated new O ring 3 Remove the Bypass Spring Then remove the Valve 105 If the Valve is stuck use pliers or similar to pull the Valve out NOTE Be careful not to scratch the Valve with the pliers as any foreign materials left inside the pump WILL seriously damage the pump 4 Fit the new Valve and or Bypass Spring then the Valve Cover 5 Ensuring the valve cover O ring is located properly hand fit t...

Страница 9: ...ousing 1 101 Adaptor Flange Elbow 1 27 Cap Head Setscrew 8 101A Adaptor Flange Elbow Plug 1 33 Dust Seal Bearing 1 102 Blanking Flange 1 34 Key Driver 1 103 Valve Cover 1 40 Seal Seat 1 103A O ring Valve cover 1 41 Seal Face 1 103B Cap Head Setscrews 4 42 Seal Sleeve 1 104 Bypass spring 1 45 Seal Spring 6 105 Valve 1 46 O ring Shaft 1 106 Spring Cap 1 47 O ring Seal Sleeve 1 106A O ring Spring Cap...

Страница 10: ......

Страница 11: ... Foreign matter in discharge line Collapsed or kinked discharge hose Pressure Viscosity Temperature or Speed not as per design conditions Foreign matter jamming parts Pump out of alignment with driver Parts worn End of service life or adverse pumping conditions Excessive Noise Foreign matter jamming parts Parts worn End of service life or adverse pumping conditions Incorrect driver speed Faulty or...

Страница 12: ...12 NOTES Visit www ebsraypumps com au for more information on any Ebsray products 156 South Creek Rd Cromer 2099 Australia Telephone 612 9905 0234 Fax 612 9938 3825 Email sy sales psgdover com ...

Отзывы: