![Dover DESTACO ROBOHAND RR Series Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/dover/destaco-robohand-rr-series/destaco-robohand-rr-series_service-manual_2524870003.webp)
Dimensions and technical information are subject to change without notice
97
Rotary Actuators | Maintenance and Assembly Procedure
RR-18, 28 Series
For more information call us at:
1-800-ROBOHAND
or
203-261-5558
Fax:
203-452-7418
Visit us on the Internet at:
www.destaco.com
3.7
RR-18 & 28
SERIES
MAINTENANCE
Third Angle
Projection
Seal Kit
Items
Thread
Locker
Krytox
™
Lubricant
Teflon
®
Based
Grease
Lightweight
Machine Oil
Super
Bonder
RR-18, -28 Series Assembled View
2
4
9
5
8
3
6
10
11
Item Qty
Name
02
1
Flange/Turntable
03 2
Rack, Piston
04 1
Pinion
05
1
Lock Nut
06
2
Plug, Flow Control
08
1
Clamp Plate
09
1
Bearing, Radial
10 1 or 2 Striker
11 2
Puck
15 1 or 2 Sensor
21 1 or 2 Push-in Fitting
22 1 or 2 Barb Fitting
25
1
Sensor Coupler
NOTE:
Contact the Robohand Sales
Department for a complete spare parts
list with order numbers and prices.
Accessory Installation & Adjustment Instructions
Installation
For each sensor.
1. Rotate flange so piston rack stops on
end stop. Install sensor as shown,
pushing in until it stops.
2. Tighten nut.
Plumbing fittings:
Either the barb fitting or the
push-in fitting can be used
for any M3 port.
Flow controls (not shown)
can be used for the main rotary
airports as additional control.
Note: Sensors need to be
readjusted when end stops
are adjusted.
25
15
2
21
22
Accessory Installation & Adjustment Instructions
3.1-3.45 (RR_DRM) RED.qxd 2/7/06 1:12 PM Page 7