![Dover DESTACO ROBOHAND RR Series Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/dover/destaco-robohand-rr-series/destaco-robohand-rr-series_service-manual_2524870002.webp)
Dimensions and technical information are subject to change without notice
96
Rotary Actuators | Maintenance and Assembly Procedure
RR-18, 28 Series
For more information call us at:
1-800-ROBOHAND
or
203-261-5558
Fax:
203-452-7418
Visit us on the Internet:
www.destaco.com
3.6
RR-18 & 28
SERIES
MAINTENANCE
Third Angle
Projection
Seal Kit
Items
Thread
Locker
Krytox
™
Lubricant
Teflon
®
Based
Grease
Lightweight
Machine Oil
Super
Bonder
RR-18, -28 Series Exploded View
Item Qty
Name
01
1
Body
02
1
Flange/Turntable
03 2
Rack, Piston
04 1
Pinion
05
1
Lock Nut
06
2
Plug, Flow Control
07
4
Turntable Mounting
Screws
08
1
Clamp Plate
09
1
Bearing, Radial
10 1 or 2 Striker
11 2
Puck
30
2
Stop Screw
(Stroke Adjustment)
31
2
Sss, Cone Point
32
2
Stop Screw
NOTE:
Contact the Robohand Sales
Department for a complete spare parts
list with order numbers and prices.
Assembly Procedure
1. Lubricate and install seals
2. Install racks inside body
3. Install plugs
4. Install stop screws, stop screw locks,
and pucks
5. Install striker(s) into desired slot from
the chamfer side of the clamp plate
and place (striker facing down and
away from plugs) onto the pucks.
6. Place bearing over clamp plate and
install the lock nut.
7. Using a .035” or 2mm allen wrench,
install and lock the 2 cone point set
screws (#31) to lock the lock nut in
place.
8. Install pinion and dowel pins into
turntable and then mate that
subassembly to the clamp plate.
9. Install turntable-mounting screws.
10. Fine-tune the stop screws to achieve
the desired stroke and then tighten
the stop screw locks.
1
5
31
7
VIEW-A
Seal Repair Kit Order #’s
See Product Data Sheets
SK
3.1-3.45 (RR_DRM) RED.qxd 2/7/06 1:12 PM Page 6