22
105643 01/10
Operating Instruction
Transport and assembly
4
Transport and assembly
The MW80 is supplied in a carton box ready
for operation. A suitable means of transport,
e.g. a high-lift truck, is required for transport.
Feet, handles and wheel support must be as-
sembled on the basis of the instructions.
4.1 Assembling the feet
1
2
Fig. 2:
Feet loosely screw on
Put Mobile Wheel Carriage even on sur-
face place
Tighten screws (1) and (2) (M12 x 20) with
a tightening moment of 60 Nm
4.2 Assembling the sliding handle
2
1
Fig. 3:
Position the sliding handle at the desired
height and connect it using screw (1)
The operating switch(2) is screwed on
beneath the rest.
4.3 Assembling the wheel support
2
1
A
B
E
C
Fig. 4:
Tighten axle A using screw (1)( (M12) with
60 Nm
Push roller (B) above axle (A) and tighten
using (C)
Tighten the entire wheel support fork (E)
using screw (2) (M10) with 40 Nm
5
Commissioning
Warning
Check that the Mobile wheel carriage
is complete and in proper working
order before the first commissioning!
Record the results of the examination
in the maintenance plan.
GB
Содержание BlitzRotary Chief MW80
Страница 92: ......