15
Please take the following preparations
when the machine is not to be used for a
long period, e.g. holidays:
1. Remove the product packs and check
the expiry date.
2. Store the product packs in a refrigerator
until you switch the dispenser back on
again. When the expiry date has passed,
throw the product packs away.
Caution:
Do not freeze product packs.
3. Clean and flush the dispenser.
4. Pull the power plug out of the socket.
5. Close the water tap.
1. Open the water tap.
2. Insert the power plug.
The dispenser starts heating up water
and starts cooling down the cooling
compartment. Drink delivery will be
blocked until the water in the boiler has
reached the correct temperature.
3. A flashing thermometer and the icon for
"Delivery blocked" will be shown on the
display (fig. 4.9).
4. Once the water has reached the preset
temperature, the flashing thermometer
and the icon for "Delivery blocked"
will disappear from the display, the
dispenser is now ready for operation.
Fig. 4.9 - Heating up/Delivery blocked icons
Note:
Depending on the dispenser model
and ambient temperature, the
heating of the boiler can take 30 ~120
minutes. The cooling of the product
compartment can take 24 hours or
more.
Note:
If the dispenser has been shut down
for longer periods, the date and time
must be set so the programmed
cleaning cycles and eco settings are
reactivated.
Switching off the dispenser
Switching on the dispenser
Содержание Cafitesse Excellence
Страница 1: ...EXCLLNC 2012 07 Cafitesse Excellence Operator Manual ...
Страница 29: ...29 ...
Страница 34: ...A B 3 4 sec B A 7 1 2 3 4 5 11 4L 12 15 min 8 9 2x 10 RINZA 6 FLUSH ONLY OPTIONAL ...