
Install filter (3) on support block or pump
(1).
Pay attention to the flow direction.
Provide pressure relief valves (2)
“Installation position”.
Provide Pressure gage if necessary.
Provide 150mm clearance for mainte-
nance work through the filter. Unscrew
the filter sump is from the filter for mainte-
nance work.
1. Bolt down the material inlet of the filter (3)
on the material outlet of a high pressure
pump (1).
2. Screw the depressurization valve (2),
depending on the alignment, bottom or
lateral.
3. Screw the high pressure hose (4) on the
material outlet of the filter (3).
4. Connect applicator (5) to the other end of
the high pressure hose (4).
Ground the filter
Personnel:
Electrician
+ additional qualification explosion pro-
tection
Protective equipment:
Protective workwear
Safety boots
1. Ground filter through pump or support
block.
4.4
Assemble pressure gage
Filter sump upwards
Secure pressure gage with screw
iary materials”.
If the filter sump is aligned down-
wards, only a pressure gage with
connection at the back can be used.
Fig. 5: Pressure gage (example)
Personnel:
Mechanic
+ additional qualification explosion pro-
tection
+ Additional qualification high pressure
Protective equipment:
Protective gloves
Face protection
Protective workwear
Safety boots
1. Screw pressure gage with connection at
the rear on the material outlet (1).
2. Align pressure gage such that it can be
read easily.
3. Test function and tightness of the pres-
sure gage.
Assembly
01/2020
Filter HP - MFT00003EN
9/36