b. Placement of equipment can avoid physical damage and hurt.
c.
Must be stored under cover to prevent dust, frost and rain from encroaching.
d. The equipment is not allowed to lie down or stand upside down.
2.3 Inspection
Disassemble the packaging of the equipment and inspect the product to ensure that the
equipment is not damaged during transportation. If any damage is found, contact the
equipment supplier. If the piping connected to the dehumidifier is arranged, it should be
checked if the piping arrangement is suitable. If the environment and installation conditions
are not satisfying, please contact the manufacturer's relevant design and technical
personnel.
To ensure optimum dehumidification effect, the fan outlet should be equipped with a diffuser.
2.4
Electrical Connections
NOTICE!
All electrical connections works must be done by local professionals
and shall be carried out
by qualified personnel. Dehumidifier control circuit has been marked with different color to
prevent confusion, unit design adopts three-phase ac power supply, electric equipment
installation and configuration are in accordance with the voltage and frequency of equipment
nameplate on the calibration.
The appliance shall be installed according to the national wiring standard.
•
The dehumidifier must not operate in a voltage or frequency beyond the manufacturing
range.
•
The three-phase ac power supply should be checked before the unit is connected to the
main power supply to ensure that the voltage fluctuation range of the power supply is not
more than ±10% of the voltage and frequency of the equipment. his check is particularly
important for high load situations (which are due to the switching of large electrical
equipment).
•
The machine set must be grounded and equipped with a power isolating switch to ensure
that the power is cut off when checking and servicing.