Ultra Evac Technical Manual
15
2/8/2013
GD-99013 Rev. D
Installation
Protective Packaging & Unpacking
WARNING:
ALWAYS have more than one person unpack and lift the evac off the shipping pallet.
Special measures are needed for and during transport of the unit. Ultra Evac Units are equipped with four
adjustable legs. Ultra Evac Units should be put on a cart or dolly for transporting during installation/de-
installation. Adjustable legs are adjusted to level the unit during installation.
To obtain information on transporting and temporary storage considerations call DMS at 1-888-466-6633.
Premature unpacking of the Ultra Evac Units could risk damage to or loss of the installation items that may
be sent with the unit. Contact customer service if unpacking the unit is necessary.
Site Preparation
A DMS Installation Technician is responsible for the physical hook-up, on-site quality control testing and
the initial start up of Ultra Evac Unit equipment. Customers are responsible for preparing the equipment
space and utilities at the installation site.
All equipment sites must be prepared in accordance with the requirements described here at least seven (7)
days prior to scheduled system installation.
This section outlines the general and specific site preparation requirements for space, water, drain, and
electrical needs are presented below. Figure 9 presents an architectural drawing of site requirements. Please
use these figures as a reference for proper site preparation.
Содержание UL-EV100
Страница 2: ...Ultra Evac Technical Manual 2 8 2013 GD 99013 Rev D...
Страница 3: ...Ultra Evac Technical Manual 2 8 2013 GD 99013 Rev D...
Страница 22: ...Ultra Evac Technical Manual 17 2 8 2013 GD 99013 Rev D Figure 9 Ultra Evac Unit Architectural Drawing...
Страница 27: ...Ultra Evac Technical Manual 22 2 8 2013 GD 99013 Rev D Figure 12 Ultra Evac Unit Wiring Diagram...
Страница 28: ...Ultra Evac Technical Manual 23 2 8 2013 GD 99013 Rev D...
Страница 29: ...Ultra Evac Technical Manual 24 2 8 2013 GD 99013 Rev D Figure 13 Ultra Evac Unit Board Schematic...