2.5 Assembly preparations
General
When planning the installation site for the terminal, the
required space specified in the diagram opposite must be
provided. This space is necessary to ensure problem-free
operation and sufficient room for servicing work.
The installation height specified is recommended to provide
persons of average height the optimum operation and view
of the display.
If it is necessary, or desired, that a different height is used,
an assembly wedge piece should be used.
Once the installation site has been determined, the cables
should be laid first of all. Specifications on the planning
and installation of time systems and access systems using
our components are described in the General Installation
Guidelines.
The following assembly types are possible:
Deep casing
• Flush-fit cabling (standard)
• Flush-fit cabling, connection of LAN and 230V
using
sockets
Flat casing
• Flush-fit cabling (standard)
• Surface wiring (supply line at bottom)
The application surface of the terminal is used here.
Caution: not possible for all terminals!
Wedge (for deep and flat casings)
• Flush cabling
• Surface wiring (supply line at bottom)
For each installation type, the relevant specifications on
the position of the cable infeed and cable length must be
observed.
L6L terminal with contactless readers
To prevent interference between devices, you
must not install two devices with contactless
readers closer to each other than the minimum
specified distance.
This distance should always be greater than
50 cm.
min.
165 mm
min.
165 mm
approx.
1450 mm
F1
F3
F4
F5
F6
F2
1
3
4
5
2
6
8
9
0
7
,
:
Esc
±
F7
F9
F10
F11
F12
F8
Installation wedge piece