9150-065-M-5-18
1
SECTION 1 - INSTALLATION
8
8
8
9
10-13
13
14
15
16
17
1.1
Hardware for the Gate
1.2
Physical Stops for the Gate
1.3
Types of Gates
1.4
Operator Mounting Positions
1.5
Underground Conduit Requirements
1.6
Pad, Post or Ceiling Mount without / with J-Box Setup
1.7
Mounting Operator and Chain
1.8
Installation of Warning Signs
1.9
Chain Tray Kit
SECTION 2 - AC POWER TO OPERATOR(S)
18
18
19
2.1
High Voltage Wire Runs
2.2
High Voltage Terminal Connection
SECTION 5 - WIRING
29
29
30
31
32
5.1
Main Terminal Description
5.2
Control Wiring for Single/Primary Operator
5.3
Auxiliary Device Wiring
5.4
Bi-Parting Gates Wiring - Dual Gate Operators
SECTION 7 - MAINTENANCE AND TROUBLESHOOTING
37
7.1 Maintenance
7.2 Troubleshooting
7.3 Accessory
Items
Model 9150 Wiring Diagrams
37
38-39
40
41-42
SECTION 6 - OPERATING INSTRUCTIONS
33
6.1
AC Power and Reset Switch
6.2 Shutdown
Conditions
6.3
Manual Gate Operation
33
34-35
35-36
SECTION 8 - OWNER OF GATE OPERATOR
43
8.1
Alarm Sounding and Gate WILL NOT Operate
8.2
Manual Gate Operation
8.3
Gate Operators Monthly Checkup
Printable Safety Page
43
44
45
46
SECTION 3 - ADJUSTMENTS
20
3.1
4602 Circuit Board Description and Adjustments
3.2
DIP-Switch SW 1 and SW 2 Settings
3.3
Automatic Open / Close Limit Adjustment
3.4 Clutch
Adjustment
3.5
Inherent Reverse Sensor Adjustment
20
21-22
23
24
24
SECTION 4 - ENTRAPMENT AND SAFETY PROTECTION
25
4.1
UL 325 Terminal Description
4.2
Entrapment Protection Device Locations
4.3
Loop Detector Wiring
25
26-27
28
TABLE OF CONTENTS
Quick Guide: DIP-Switches
Quick Guide: Terminal Descriptions
Operator Specifications
Slide Gate Requirements
Safety Information for Slide Gate Operators
ASTM 2200 Standard for Gate Construction
Important Safety Instructions
Instructions regarding intended installation:
Important Notices
UL325 Entrapment Protection
Glossary
Quick Guide-1
Quick Guide-2
Previous Page
2
3
4
4
4
5
6
7
QUICK GUIDES
Содержание 9150-080
Страница 50: ...9150 065 M 5 18 46...