9150-065-M-5-18
32
ON
ON
REVERSE
SENSITIVITY
EXIT
LOOP
FULL OPEN
DOORKING
4602-010
SW1
SW3
SW2
OPEN
TIMER
NC
NO
1
2
3
4
5
6
7
8
9
10
1
ON
2
3
4
ON
EXIT
LOOP
SW1
18
17
16
15
14
13
12
11
#10
9
8
7
6
5
4
3
2
1
ON
EX
LO
FULL OPEN
DOORKING
4602-010
NC
NO
1
2
3
4
5
6
7
8
9
10
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Open Beam-1
Common-2
Close Beam-3
Common-4
24 VAC-5
Common-6
Open Edge-7
Common-8
Close Edge-9
Common-10
Open Beam-1
Common-2
Close Beam-3
Common-4
24 VAC-5
Common-6
Open Edge-7
Common-8
Close Edge-9
Common-10
UL 325
Terminal
UL 325
Terminal
Main Terminal
Main Terminal
UL 325
DIP-switches
1, 2 and 3 ON
1
ON
2
3
4
UL 325
DIP-switches
1, 2 and 3 ON
1
ON
2
3
4
Secondary
Operator
Primary
Operator
To Close Beam #3
To Open Edge #7
To Common #4
To Open Edge #7
To Common #8
To Common #8
Fence
Gate
Close Beam
Open Edge
Open Edge
Fence
Gate
5.4 Bi-Parting Gates Wiring - Dual Gate Operators
Entrapment Protection Devices
for Bi-Parting Gates
•
Separate power source for
photo sensor (See page 25).
Interconnection Cable
Sold separately from DoorKing.
Reverse loop lead-in
wires are wired in series.
When using Dual
Channel plug-in
loop detector.
Connect #4 to #10:
fully opens gates.
Open Beam Note:
If
Open beam
is required for
entrapment protection, #1 and #2
UL 325 terminals MUST be wired
in parallel between primary and
secondary operators.
SW 2, switch 1
must be
OFF
.
Plug into
Primary
Operator Exit Loop Port
Dual Channel
9409
Automatic
Exit Loop
Reverse
Loop
Reverse
Loop
LL OPE
LL OP
OPE
Secondar
y Operator
Yellow
24 Volt
Relay
Com
Purple
Brown
Yellow
Purple
Brown
Orange
Jumper Wire
Orange
Blue
Red
Red
Gray
Blue
Gray
Green to
primary
operator
chassis
ground.
Green to
secondary
operator
chassis
ground.
#3 Red Close Beam
#4 Gray Common
#7 Blue Open Edge
#4 Yellow
#5 Purple
#6 Brown
#18 Orange
Close Beam Red #3
Common Gray #4
Open Edge Blue #7
Yellow #4
Purple #5
Brown #6
Orange #18
Loop Lead-In Wires
N.O.
Com
Loop Detectors
3-Wire Receiver
(Fully Opens Gates)
Jumper Wire
250 mA max.
4-wire receiver wiring,
see page 30.
ON
1
2
345678
SW 2
LL OPEN
LL OP
OPEN
Primar
y Operator
•
Requires AC power to
each
operator.
•
Both
operator DIP-switches must be set.
•
Connect all control devices, auxiliary devices
and loops to the
primary
operator
only
.
UL 325 Terminal
Primar
y Operator
Secondar
y Operator
Main Terminal
Reflector
Main terminal #3 AND
UL 325 terminal #5 Note:
Exceeding 250 mA of power
from either of these terminals
may cause the circuit board
transformer to overheat,
causing intermittent problems.
Содержание 9150-080
Страница 50: ...9150 065 M 5 18 46...