background image

4

Fig. 10. Safety glasses

Fig. 11. Hard hat

Fig. 12. Gloves

Fig. 7. Wrench set

Fig. 8. Drill screwdriver

Fig. 9. Stepladder

3.4. SAFETY RULES FOR ELECTRICAL INSTALLATION WORK

Carry out electrical installation works in accordance with «Safety rules for electrical installations» and «Safety regulations 
for the operation of consumer electrical installations».

Fig. 4. Drill bit set

Fig. 5. Screwdriver set

Fig. 6. Hex bits set

Fig. 1. Water level

Fig. 2. Measuring tape

Fig. 3. Pensil

4.2. TOOLS

4. INSTALLATION

4.1. GENERAL RULES

Installation of dock shelter is restricted to authorized per-
sonnel trained at DoorHan training center and having a 
corresponding certificate. Use of appropriate mounting 
tools is strictly required. The manufacturer does not di-
rectly control installation, operation and maintenance of 
the product and can not be held responsible for instal-
lation safety and quality. It is the mounting organization 
which is held responsible for quality of installation. 

The contents of this manual can not be the basis for any 
kind of claim to DoorHan. The manufacturer reserves the 
right to make any changes to the product construction, 
structure, components and accessories without notice.
Should any questions arise during product operation 
please refer to DoorHan dealer. Its address and phone 
number is provided in the sales contract.

INST

ALLA

TION

Содержание DSHINF Series

Страница 1: ...1 DoorHan 08 2020 Operation and Installation Instructions Inflatable dock shelter of DSHINF series General Information 2 Design 2 Safety Rules 3 Installation 4 Operation 20 Appendix 21...

Страница 2: ...ght 3 Front storage curtain 4 Left right frame 5 Counterweight 6 Blower 7 Dock shelter roof 2 DESIGN Table 1 Specifications Parameter Value Air bags control system Three phase power supply 380 415 V 5...

Страница 3: ...ety instructions can operate power tools It is recommended to use power tools operating at volt age not exceeding 380 220 V Choose power tool taking into consideration electric shock hazard of the pre...

Страница 4: ...el trained at DoorHan training center and having a corresponding certificate Use of appropriate mounting tools is strictly required The manufacturer does not di rectly control installation operation a...

Страница 5: ...4 Fig 5 Fig 6 Fig 7 Fig 10 Fig 8 Fig 11 Fig 9 Fig 12 4 3 PACKAGE INVENTORY INSTALLATION 2 pcs 2 pcs 2 pcs Fig 14 Fig 15 Fig 13 Fig 18 Fig 17 Fig 16 Fig 19 B C E D F L 250 mm 110 mm 6 3 25 mm 6 3 38 m...

Страница 6: ...6 INSTALLATION Fig 1 2 Fig 1 3 Fig 1 Prepare side frames View 1 100 mm 500 mm Fig 1 1 View 1 125 mm 7 mm 50 mm 4 4 INSTALLATION...

Страница 7: ...7 INSTALLATION Fig 2 View 2 Fig 2 1 View 2 105 mm Fig 2 2...

Страница 8: ...8 Fig 3 Fasten side frames to building wall Fig 3 1 View 1 Fig 3 2 View 2 200 mm View 1 View 2 INSTALLATION...

Страница 9: ...9 INSTALLATION Fig 4 3 View 2 Fig 4 1 View 1 Fig 4 Fig 4 4 Fig 4 2 100 mm 300 mm View 1 View 2...

Страница 10: ...10 INSTALLATION Fig 5 Fig 5 2 Fig 5 3 Fig 5 1...

Страница 11: ...11 INSTALLATION Fig 6 Install top air bag Fig 6 1 Fig 6 2...

Страница 12: ...12 Fig 7 Install guide rod Fig 7 1 Fig 7 2 Fig 7 3 INSTALLATION...

Страница 13: ...13 INSTALLATION Fig 8 Fig 9 Fig 10 400 mm 155 mm 90 820 mm...

Страница 14: ...Install counterweight Fig 13 1 View 1 Fig 13 2 View 2 View 2 View 1 B INSTALLATION Fig 12 Fig 11 F Before attaching the counterweight cable to the shaft turn the shaft until the top air bag rises all...

Страница 15: ...15 INSTALLATION Fig 14 Connect air transfer tubes Fig 14 1 Fig 14 2 B...

Страница 16: ...16 INSTALLATION Fig 15 Fig 15 1 Fig 15 2 Fig 15 4 Fig 15 3 Fig 15 5 E D D D...

Страница 17: ...17 Fig 16 Fig 16 1 Fig 16 2 INSTALLATION B B...

Страница 18: ...18 Fig 17 Fig 17 1 Fig 17 2 INSTALLATION B B...

Страница 19: ...19 Fig 18 Fig 20 Fig 19 Fig 21 INSTALLATION 4 2 u 32 mm C...

Страница 20: ...ck is stationary the handbrake is put on the wheels are choked 4 Inflate dock shelter switch the blower on by pressing a push button on the control unit if the blower motor is operated with the dock l...

Страница 21: ...100 30 100 10 10 1 0 10 Dock shelter wall Dock leveler Bumper Dock shelter wall Dock leveler Bumper A A A A Bar C Clamping plate Bumper PVC buffer Dock shelter wall Rubber bumper PVC buffer Rubber bu...

Страница 22: ...22 Fig 2 Inflatable dock shelter exploded view APPENDIX 1 2 6 9 8 10 16 19 18 3 5 4 7 15 17 20 13 20 11 12 21 14 22...

Страница 23: ...10 DKHA20040 3410 Clamping profile L 3410 mm 11 DSI02 101 Counterbalance cover 2000 mm 12 DSI02 1101 Mounting angle 13 168 Rivet 4 0 u 12 14 14019 Self tapping screw ISO 15480 ST 6 3 u 25 15 9502 Sel...

Страница 24: ...KHA20040 3610 Top clamping profile L 3610 mm 11 DSI02 101 Counterbalance cover 2000 mm 12 DSI02 1101 Mounting angle 13 168 Rivet 4 0 u 12 14 14019 Self tapping screw ISO 15480 ST 6 3 u 25 15 9502 Self...

Страница 25: ...KHA20040 3610 Top clamping profile L 3610 mm 11 DSI02 101 Counterbalance cover 2000 mm 12 DSI02 1101 Mounting angle 13 168 Rivet 4 0 u 12 14 14019 Self tapping screw ISO 15480 ST 6 3 u 25 15 9502 Self...

Страница 26: ...ly 4870 u 800 mm 1 DSI07 32 Left side air bag 4600 u 800 mm left 1 2 DSI03 11 Left shelter wall assembly 4870 u 800 mm 1 Table 2 to Fig 3 Right side frame Part number Description Qty DSI04 2 Right fra...

Страница 27: ...15 Right end support bracket 70u 5 without plate 1 6 14019 Self tapping screw ISO 15480 ST6 3 u 25 4 Table 2 to Fig 4 Top frame with 1600 mm top air bag option Part number Description Qty DSI01 4 Uppe...

Страница 28: ...l formed channel 60 32 4 mm shelter side wall with a fastening angle self tapping screw PVC dowel shelter side wall with a fastening angle concrete brick Installation clearance 600 700 mm for a shelte...

Страница 29: ...U V W PE M 2 4 6 PE L2 L3 L1 N 3 5 1 13 Fig 6 Blower motor wiring diagram If the blower motor is connected to the dock leveler control unit than see a corresponding wiring diagram in the control unit...

Страница 30: ...30 NOTES...

Страница 31: ...NOTES 31...

Страница 32: ...n on purchasing distribution and servicing contact DoorHan central office at 120 Novaya street bld 1 Akulovo village Odintsovo district Moscow region 143002 Russia Phone 7 495 933 24 00 E mail info do...

Отзывы: